My WebLink
|
Help
|
About
|
Sign Out
Home
Imagine Roseville 2025 Final Report
Roseville
>
Studies, Task Forces, Special Committees, Reports
>
Imagine Roseville 2025
>
Imagine Roseville 2025 Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 12:13:03 PM
Creation date
6/8/2012 12:53:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cit_y Council/Public Updates: The Steering Committee and consultant provided the Council <br />and public (via cable TV) with regular updates about the Imagine Roseville 2025 process, <br />findings, activities, results, and recommendations. See all these in Appendix: Council-Public <br />Updates. <br />Open House: On December 7, 2006 the Steering Committee hosted a final Open House at <br />City Hall for the public to review the final draft recommendations for goals, strategies, and <br />vision, and to offer their final comments and edits. This was publicized widely and very well <br />attended — and changes were made to the final recommendations as a result of their input. <br />See Appendix: Draft Goals, Strategies, Tactics. <br />Steering Committee Meetings: These were facilitated by the consultant and generally occurred <br />every two weeks in order to actively guide the overall process, resolve issues and concerns, and <br />take innovative approaches to engaging the public, reaching consensus, and moving forward <br />toward strong and constructive recommendations. Agendas and notes were posted and visitors <br />were frequently in attendance. Steering Committee members also attended numerous <br />Subcommittee meetings and their Listening Sessions, and participated in several collaborative <br />workshops. See Appendix: Steering Committee as well as separate documentation of all agendas <br />and notes. <br />Subcommittee Meetings: The six Subcommittees arranged and managed their own meetings, <br />usually every two weeks, to work through all the issues offered by the public as well as <br />background information. They frequently invited guests to speak at their meetings and each also <br />hosted at least two Listening Sessions to gather additional insights from the public. They met <br />mid-July through early November, and also participated in a number of training and other <br />workshops. See Appendix: Subcommittees. <br />Workshops: The consultant facilitated a number of workshops over the course of Imagine <br />Roseville 2025 to provide participants with the structured time to pursue issues in sufficient <br />depth. These included a kick-off workshop for Subcommittee members with the Steering <br />Committee; a training workshop for Subcommittee co-chairs and the Steering Committee; two <br />major goal and strategy workshops with Subcommittee members, staff, Council, and the Steering <br />Committee; and a visioning workshop with the Steering Committee; a workshop with the <br />Council and Steering Committee. These are documented in their relevant sections and <br />Appendices. <br />Imagine Roseville 2025 Final Report, January 2007 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.