Laserfiche WebLink
construction of a new fire station and authorize the fire department to conduct a competitive re- <br />176 <br />bid process for the three contracts listed. <br />177 <br />178 <br />Contract # Description <br />179 <br /> <br />180 <br />2200 Plumbing/Heating piping <br />181 <br />182 <br />2300 HVAC/Air Distribution <br />183 <br />184 <br />2500 Temperature Controls <br />185 <br />186 <br />2600 Electrical/communication/security/technology <br />187 <br />188 <br />189 <br />Prepared by: Timothy O’Neill, Fire Chief <br />190 <br />Attachment A: Bid Package #2 Bids <br />191 <br />192 <br />193 <br />Page 5 of 5 <br /> <br />