My WebLink
|
Help
|
About
|
Sign Out
Home
2002 Approved Budget
Roseville
>
Budget
>
2002 Approved Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 1:16:02 PM
Creation date
6/19/2012 1:10:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville, Minnesota <br />DEPARTMENTAL DESCRIPTION <br />2002 Budget <br />STREETS <br />Fund: General <br />Account Number: 100 - 021.000 <br />Organizational Accountability: Public Works Director <br />The Streets Department provides the City with a sound, well <br />managed program of street maintenance and related services <br />such as signage and snow removal. As levels of street <br />reconstruction are reduced, the Streets Department will <br />develop a more intensive and systematic maintenance effort. <br />CITY RESOURCE INPUTS <br />EXPECTED CITY OUTCOMES <br />Strategic Outcomes: <br />Public investment protected <br />Taxpayer costs reduced <br />Reduction in accidents <br />r' <br />c � Im <br />IV -18 <br />2002 STxATEGIC WORK <br />PLAN <br />Complete the crack sealing and <br />seal coating of 15 miles of city <br />streets <br />Clear, widen, and sand all city <br />streets within one day following a <br />snow fall <br />Work with other City Departments <br />on better community facilities for <br />both recreation and providing basic <br />services <br />Develop a maintenance program <br />for streetscape maintenance <br />2000 ACHIEVEMENTS <br />it Achieved the objectives of <br />crack sealing and seal coating <br />Was able to clear, widen and <br />sand all city streets within one <br />day following a snow fall <br />Citizen Benefit /Impact: <br />•:� Well maintained street and pathway <br />system <br />Timely and responsive snow removal <br />
The URL can be used to link to this page
Your browser does not support the video tag.