Laserfiche WebLink
Department <br />Category <br />2002 <br />2003 <br />2004 <br />2005 <br />2006 <br />Total Future <br />PMP Repairs /Replace <br />50,000 <br />50,000 <br />Scada Upgrades <br />10,000 <br />10,000 <br />Sewer Main Lining <br />100,000 <br />100,000 <br />Lift Station Upgrades <br />20,000 <br />20,000 <br />Replace Generator <br />35,000 <br />35,000 <br />Total: <br />57,100 <br />40,000 <br />122,000 <br />330,000 <br />165,000 <br />714,100 <br />Department Total: <br />57,100 <br />40,000 <br />122,000 <br />330,000 <br />165,000 <br />714,100 <br />Storm Sewer <br />Utilities <br />J- Tamper <br />600 <br />600 <br />Asset Management Software <br />2,500 <br />2,500 <br />PMP Repairs /Replace <br />30,000 <br />30,000 <br />Pond System Improvements <br />200,000 <br />200,000 <br />System Repairs /Improvements <br />200,000 <br />200,000 <br />Replace Steamer #130 <br />10,000 <br />10,000 <br />PMP Repairs /Replace <br />30,000 <br />30,000 <br />Hydraulic Excavator <br />120,000 <br />120,000 <br />Pond Improvements <br />800,000 <br />800,000 <br />System Repairs /Improvements <br />200,000 <br />200,000 <br />PMP Repairs /Replace <br />50,000 <br />50,000 <br />Pond /System Improvements <br />200,000 <br />200,000 <br />Leaf Site Improvements <br />100,000 <br />100,000 <br />PMP Repairs /Improvements <br />50,000 <br />50,000 <br />Pond System Improvements <br />200,000 <br />200,000 <br />PMP Improvements <br />50,000 <br />50,000 <br />SCADA Upgrade <br />5,000 <br />5,000 <br />Total: <br />233,100 <br />1,160,000 <br />250,000 <br />350,000 <br />255,000 <br />2,248,100 <br />Vehicles <br />Street Sweeper #126 <br />105,000 <br />105,000 <br />Replace Street Sweeper #120 <br />105,000 <br />105,000 <br />Replace 5 -Ton Trailer #135 (1/2 cost) <br />4,000 <br />4,000 <br />Replace #136 -1 Ton Dump <br />35,000 <br />35,000 <br />Total: <br />105,000 <br />105,000 <br />4,000 <br />35,000 <br />249,000 <br />Department Total: <br />338,100 <br />1,265,000 <br />250,000 <br />354,000 <br />290,000 <br />2,497,100 <br />Streets <br />Equipment <br />Concrete /Asphalt Pavement Saw #138 <br />8,000 <br />8,000 <br />3 Ton Dump w /Snow Equipment #112 <br />95,000 <br />95,000 <br />3/4 Ton Pickup w /Plow #102 <br />25,000 <br />25,000 <br />Replace Skidsteer Loader w /attachments #119 <br />35,000 <br />35,000 <br />Replace 5 -ton trailer #135 (1/2 cost) <br />4,000 <br />4,000 <br />Replace Melter #137 <br />25,000 <br />25,000 <br />Replace Portable Line Striper #143 <br />6,000 <br />6,000 <br />Upgrade Sign- Making Equjipment <br />10,000 <br />10,000 <br />Self- Propelled Paver (Split cost w /other cities) <br />75,000 <br />75,000 <br />Total: <br />8,000 <br />120,000 <br />70,000 <br />85,000 <br />283,000 <br />Vehicles <br />3 Ton Dump w /Snow Equip. #109 <br />100,000 <br />100,000 <br />Road Grader #121 <br />200,000 <br />200,000 <br />Replace Pavement Router #140 <br />10,000 <br />10,000 <br />4x4 Pickup w /Plow #116 <br />25,000 <br />25,000 <br />Replace Wheel Loader #101 <br />125,000 <br />125,000 <br />Replace Dump Truck w /Snow Equipment #106 <br />110,000 <br />110,000 <br />Replace Oil Distribution Body #124 <br />75,000 <br />75,000 <br />