My WebLink
|
Help
|
About
|
Sign Out
Home
2002 Approved Budget
Roseville
>
Budget
>
2002 Approved Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 1:16:02 PM
Creation date
6/19/2012 1:10:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Total $37,699,053 $38,089,474 390 421 <br />Expenditure Comments <br />The overall budget for expenditures is up from 2001 by .4 %. <br />Major increases include personnel expense and services. These changes are due to the 2001 wage <br />and salary adjustments, insurance rate changes and a number of retirements in 2001, which are <br />one -time charges. The services and charges increase reflect the substantial increase the City has <br />had to absorb in fuel expense. <br />The 2002 capital expense is down by over $1 million dollars, primarily due to the completion of <br />a number of parks and street projects in 2001. <br />Tax increment expenditures are up substantially because the projected early debt retirement for <br />2004. <br />III. MAJOR POLICY AND FINANCIAL ISSUES <br />There were a number of issues that were considered during the preparation of this budget: <br />Community Facilities Planning <br />The 2002 budget provides funding ($250,000) for the planning and design of city facility <br />improvements, which are expected to submitted to a vote of the electorate in November. <br />Telephone System Replacement <br />The City's phone system was installed in the mid -90's and the current equipment is becoming <br />antiquated. The 2002 budget includes $125,000 for future phone system replacement or upgrade. <br />Fire Protection and Suppression <br />The approved budget provides for an increase in the Department's personnel costs. The increase <br />is intended to permit the community -based fire service to develop a shift system for most of the <br />hours of coverage. This project has been under trial in the early part of 2001 and it appears to be <br />have considerable merit. Staff is recommending the trial be expanded for 2002. In addition, a <br />new position of Assistant Fire Chief has been included. The purpose for this position is to <br />provide for stronger administrative backup for firefighter support, while a community -based <br />(paid -on -call) system is retained. <br />A major expenditure of $150,000 has been programmed to replace the SCBA system for the fire <br />I -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.