My WebLink
|
Help
|
About
|
Sign Out
Home
2007 Approved Budget
Roseville
>
Budget
>
2007 Approved Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 1:45:35 PM
Creation date
6/19/2012 1:41:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville — 2007 Budget <br />Division /Program: Streets <br />Organizational Responsibility: Public Works Director <br />Division / Program Description <br />The Streets Division provides maintenance services such as snow & ice control, pavement maintenance, <br />right -of -way maintenance, street signage, and implementation of a proactive pavement management <br />program for City streets, sidewalks, and pathways. The Program's activities are accounted for in the <br />General Fund. <br />2007 Goals and Objectives <br />• Keep our pavement rating high in light of loss of staff due to budgetary reduction. Meet the <br />demand of increasing streetscape and right -of -way maintenance needs. Find cost effective ways to <br />replace our existing pathways if staffing levels do not allow continuation of the public /private <br />joint project model that has worked so well the past six years <br />Budget Category <br />2004 <br />Actual <br />2005 <br />Actual <br />2006 <br />Budget <br />2007 <br />Budget <br />$Increase <br />(decrease) <br />% Incr. <br />(decr.) <br />Personnel Services <br />$ 516,369 <br />$ 501,383 <br />$ 511,800 <br />$5339500 <br />$ 21,700 <br />4.20N <br />Supplies &Materials <br />211,942 <br />256,819 <br />231,000 <br />2419925 <br />10,925 <br />4.7% <br />Other Services &Charges <br />100,850 <br />173,294 <br />185,275 <br />1729525 <br />(12,750) <br />(6.9)% <br />Capital Outlay <br />- <br />- <br />- <br />- <br />- <br />0.0% <br />Total <br />$ 829,161 <br />$ 931,496 <br />$ 928,075 <br />$9479950 <br />$ 19,875 <br />2.1% <br />Full -Time Equivalent Positions I 8.00I 7.00I 7.00I 7.00I <br />2007 Budget Impact Items <br />• Personnel costs include 3.0% COLA on wages, and a 10% increase in health/dental premiums <br />• Increase in `Supplies and Materials' due to higher fuel costs <br />2005/2006 Achievements <br />• Completed all street maintenance programs on time and within budgets <br />• Completed tree trimming along 15% of boulevards & corrected several visibility issues <br />• Met or exceeded snow and ice control policy goals at expected service levels <br />• Met pavement management goals, resurveyed 20% of street network <br />• Reconstructed 1.5 miles of pathway and one city parking lot <br />52 <br />2004 <br />2005 <br />2006 <br />2007 <br />Human Resource Allocation <br />Actual <br />Actual <br />Budget <br />Budget <br />Full -Time Equivalent Positions I 8.00I 7.00I 7.00I 7.00I <br />2007 Budget Impact Items <br />• Personnel costs include 3.0% COLA on wages, and a 10% increase in health/dental premiums <br />• Increase in `Supplies and Materials' due to higher fuel costs <br />2005/2006 Achievements <br />• Completed all street maintenance programs on time and within budgets <br />• Completed tree trimming along 15% of boulevards & corrected several visibility issues <br />• Met or exceeded snow and ice control policy goals at expected service levels <br />• Met pavement management goals, resurveyed 20% of street network <br />• Reconstructed 1.5 miles of pathway and one city parking lot <br />52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.