City of Roseville — 2008 Budget <br />Capital Improvement Plan <br />The following tables summarize the 2008 -2012 Capital Improvement Plan (CIP). The planned capital <br />expenditures for the current year (2008) have been incorporated into the Budget. The remaining years <br />are provided as estimates for planning purposes only. Only after incorporation within successive <br />budgets or as approved separately by the City Council will these items be considered funded. <br />Beyond 2008, purchases or projects are included in the CIP if they are somewhat expected to occur and <br />for which cost estimates can be reasonably obtained. Under current budgetary restraints, it is recognized <br />that the annual budget could not absorb all of the purchases noted in the CIP. Each individual purchase <br />or project will be evaluated at a subsequent date, at which time it will be determined if it is financially <br />feasible. <br />Many of the items contained in the CIP will require on -going operational costs and in some cases <br />produce operational savings. However, given the speculative nature of latter -year purchases, the exact <br />costs cannot be reasonably quantified beyond next year. The additional net operating costs resulting <br />from 2008 CIP items are approximately $20,000. This relatively small impact is the result of the City's <br />practice to establish sinking funds (asset replacement funds) through annual depreciation charges, which <br />minimizes the impact on on -going operating budgets. The additional amount, albeit small, reflects <br />general price increases for the planned replacement of the City's vehicle fleet and infrastructure. <br />Major capital projects for 2008 include: <br />1) $700,000 renovation of the Skating Center <br />2) $1,500,000 mill and overlay for selected neighborhood and MSA streets <br />3) $205,000 for water meter replacements and an automated meter reading system <br />4) $350,000 for sewer line repairs and replacements <br />5) $350,000 for stormwater system improvements <br />Funding for all projects will be provided for with sinking funds (reserve funds) that have been <br />systematically set aside over a number of years. <br />With the exception of the automated meter reading system, all of the expenditures are designed to <br />replace existing infrastructure or in the case of the Skating Center; make improvements that were <br />prescribed in the original design of the facility. The automated meter reading system will allow the City <br />to read commercial water meters using radio frequency technology which is expected to save the City <br />tens of thousands of dollars annually. <br />78 <br />