Laserfiche WebLink
97 <br />City of Roseville - <br />2008 Budget <br />CIP - Sanitary Sewer <br />Description <br />Type <br />2008 <br />2009 <br />2010 <br />2011 <br />2012 <br />Total <br />Sewer main repairs <br />I <br />$ 50,000 <br />$ 50,000 <br />$ 60,000 <br />$ 75,000 <br />$ 75,000 <br />$ 310,000 <br />Sewer main lining <br />I <br />150,000 <br />150,000 <br />150,000 <br />200,000 <br />200,000 <br />850,000 <br />I & I reduction <br />I <br />150,000 <br />150,000 <br />150,000 <br />100,000 <br />100,000 <br />650,000 <br />Lift station repairs /upgrades <br />B <br />50,000 <br />10,000 <br />100,000 <br />10,000 <br />10,000 <br />180,000 <br />Retrofit Fulham Lift Station <br />B <br />- <br />- <br />- <br />- <br />- <br />- <br />Retrofit Wagner Lift Station <br />B <br />- <br />- <br />- <br />- <br />- <br />- <br />Replace /Upgrade SCADA system <br />E <br />- <br />- <br />- <br />- <br />- <br />- <br />Electronic message board (4 -way) <br />E <br />5,000 <br />- <br />- <br />- <br />- <br />5,000 <br />Shop sweeper (6 -way split) <br />E <br />6,000 <br />- <br />- <br />- <br />- <br />6,000 <br />Replace 1990 air compressor <br />E <br />- <br />- <br />15,000 <br />- <br />- <br />15,000 <br />Mainline televising system <br />E <br />- <br />- <br />- <br />- <br />- <br />- <br />Zero -turn mower (1/4 cost) <br />E <br />- <br />- <br />- <br />- <br />- <br />- <br />#201 Jetter /Vactor <br />V <br />- <br />- <br />- <br />- <br />- <br />- <br />#202 1 -ton with dump box /plow <br />V <br />- <br />35!1000 <br />- <br />- <br />- <br />35!1000 <br />#206 1 -ton service truck <br />V <br />- <br />- <br />- <br />- <br />- <br />- <br />#213 Extend -a jet replacement <br />V <br />- <br />- <br />- <br />- <br />- <br />- <br />#220 Towmaster trailer - 10 ton <br />V <br />- <br />6,000 <br />- <br />- <br />- <br />6,000 <br />#360 Backhoe (4 -way split) <br />V <br />60,000 <br />- <br />- <br />- <br />- <br />60,000 <br />#225 Backhoe (4 -way split) <br />V <br />- <br />- <br />30,000 <br />- <br />- <br />30,000 <br />#601 Skidsteer (1/4) <br />V <br />- <br />- <br />- <br />- <br />- <br />- <br />Self - propelled paver (4 -way split) <br />V <br />- <br />30,000 <br />- <br />- <br />- <br />30,000 <br />Add single axle jetter to fleet <br />V <br />- <br />- <br />- <br />- <br />- <br />- <br />Total <br />$ 471,000 <br />$ 431,000 <br />$ 505,000 <br />$ 385,000 <br />$ 385,000 <br />$ 2,177,000 <br />97 <br />