Laserfiche WebLink
City of Roseville — 2012 Budget <br />Division /Program: Storm Drainage <br />Organizational Responsibility: Public Works Director <br />Division / Program Description <br />Storm Drainage division provides for the management of storm water drainage in the City; including <br />flood control, pollution and contamination prevention, street sweeping, and the leaf - pickup program. <br />The Program's activities are accounted for in the Storm Drainage Fund. <br />2012 Goals and Objectives <br />• Sweep all City streets at minimum bi- annually focusing on environmentally sensitive areas first <br />with vacuum sweeper. <br />• Restore two storm ponding areas per year removing sediment resulting in improved water quality. <br />• Continue catch basin repair and cleaning program. <br />• Continue storm sewer inspection an inventory program as required by NPDES permit. <br />• Implement revised Watershed District rules as mandated. <br />Financial Summary <br />2012 Budget Impact Items <br />• Personnel increases include a 1% cost -of- living increase for City Staff. The costs are offset by <br />lower healthcare - related costs. <br />• Increase in Other Services & Charges is due to higher depreciation costs. <br />• `Capital Outlay' provides for the scheduled replacement of infrastructure, vehicles and equipment, <br />which can fluctuate from year to year. <br />2010/2011 Achievements <br />• Continued structure inspections and update of infrastructure records utilizing GPS and GIS <br />technology. <br />• Worked with residents resolving backyard drainage issues. <br />• Provided technical assistance to residents and property owners installing rain gardens and other <br />water quality improvements. <br />• Rehabilitated infrastructure in conjunction with pavement projects and as identified by structure <br />inspections. <br />61 <br />2008 <br />2009 <br />2010 <br />2011 <br />2012 <br />$ Increase <br />% Increase <br />Actual <br />Actual <br />Actual <br />Budget <br />Budget <br />Decrease <br />Decrease <br />Personal Services <br />$ 1701691 <br />$ 2261323 <br />$ 2741665 <br />$ 3181654 <br />$ 3161837 <br />$ (11817) <br />-0.6% <br />Supplies & Materials <br />491680 <br />511022 <br />601212 <br />521200 <br />551301 <br />31101 <br />5.9% <br />Other Services & Charges <br />5221381 <br />5381215 <br />5211847 <br />6161490 <br />6871800 <br />711310 <br />11.6% <br />Capital Outlay <br />(16,616) <br />411507 <br />(10,299) <br />7951000 <br />8501000 <br />551000 <br />6.9% <br />Total <br />$ 7261136 <br />$ 8571067 <br />$ 8461425 <br />$117821344 <br />$119091938 <br />$ 127,594 <br />7.2% <br />FTE's <br />3.42 <br />3.42 <br />3.42 <br />4.03 <br />4.03 <br />2012 Budget Impact Items <br />• Personnel increases include a 1% cost -of- living increase for City Staff. The costs are offset by <br />lower healthcare - related costs. <br />• Increase in Other Services & Charges is due to higher depreciation costs. <br />• `Capital Outlay' provides for the scheduled replacement of infrastructure, vehicles and equipment, <br />which can fluctuate from year to year. <br />2010/2011 Achievements <br />• Continued structure inspections and update of infrastructure records utilizing GPS and GIS <br />technology. <br />• Worked with residents resolving backyard drainage issues. <br />• Provided technical assistance to residents and property owners installing rain gardens and other <br />water quality improvements. <br />• Rehabilitated infrastructure in conjunction with pavement projects and as identified by structure <br />inspections. <br />61 <br />