My WebLink
|
Help
|
About
|
Sign Out
Home
2012-06-26_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2012
>
2012-06-26_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2012 8:48:42 AM
Creation date
6/22/2012 8:40:12 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
6/26/2012
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jy <br />Update <br />The northerly 400 feet of Partridge Road between <br />County Road C -2 and the cul- de- sac is scheduled <br />for pavement rehabilitation this summer. The City's <br />Contractor, Valley Paving, will start work the week <br />of June 18. <br />The Contractor will be replacing the street <br />pavement. The contractor will remove and replace <br />curb. Curbs scheduled for removal have been <br />marked. The existing pavement will be ground up <br />and graded out for new pavement. Finally, the <br />streets will be paved with two lifts of bituminous. <br />This work should take about 4 weeks. <br />The work is anticipated to be complete in July. The <br />Contractor's full schedule is available on the project <br />webpage. We meet with the contractor weekly and <br />update this schedule if it changes. This schedule is <br />weather dependent. <br />The Contractor will try to maintain access during <br />construction. If you have special access needs, <br />please contact us to let us know. <br />Storm Sevaer Improvements <br />We will be installing storm water retention features <br />behind the curb at the following locations: <br />• Between the driveways to 2965 Partridge. <br />• In the northeast corner of the cul- de-sac and <br />along the east curb line of the road. <br />Mail Delivery & Garbage Pick up <br />The construction work should not impact your mail <br />delivery or garbage pickup. Schedules and times <br />should remain unchanged. <br />Safety <br />Your assistance in keeping the work zone safe is <br />important. The noise and dust created by <br />construction traffic make it difficult for workers to <br />watch onlookers. Heavy equipment operators must <br />concentrate on the job at hand and may not notice <br />children playing near or behind equipment. <br />Please remind children to stay clear of the <br />construction area and equipment both during <br />working and non - working hours. <br />2012 Pavement <br />Management Project <br />Curb and Gutter <br />The curb and gutter repairs at driveways are <br />marked. When the replacement curb is poured, <br />you and your customers will not be able to use that <br />driveway for five -days. This allows the concrete to <br />harden or "cure ". <br />Private Systems in right of my <br />Underground sprinklers and electrical for lights <br />within 10 or 15 feet of the curb marked for removal, <br />or areas scheduled for utility work need to be <br />removed from the right of way. <br />Removal and reinstallation of these items is the <br />responsibility of the property owner. We <br />recommend that you mark with paint or flags the <br />location of underground wires or sprinklers <br />immediately. <br />If you are not sure if your system is in the way, <br />please call Dean Findell. <br />The system should be removed from the city right - <br />of- way before construction starts the week of June <br />18. If you cannot meet this schedule, please <br />contact us. <br />If these items are not removed, the contractor will <br />damage them during construction. <br />Check for construction updates at: www.citvofroseville.com /2012PMP <br />