Laserfiche WebLink
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: June 26, 2012 <br />Item Description: Storm Water Management Plan Update Discussion <br />Item No: 7 <br />Background: <br />The City has recently initiated an update to its Comprehensive Surface Water Management Plan <br />(CSWMP) which was originally developed in 1990 and was last updated in 2002. The CSWMP <br />is a document that is required to be updated to maintain consistency with local watershed <br />standards and with the Metropolitan Surface Water Management Act. The CSWMP is a required <br />chapter of the City's overall Comprehensive Plan and establishes the City's vision and practices <br />for managing storm water and surface water drainage throughout the City. The Commission <br />provided feedback to the consultant at last month's meeting after an introduction of the process <br />for this update. Ron Leaf, the Project Manager from SEH will be in attendance to give a brief <br />presentation of the first draft of the plan and to lead the discussion. <br />Attached is the first draft of the CSWMP. There are a number of sections that are still in <br />development and formatting will be corrected as these sections are added. Staff would like <br />feedback from the commission regarding the draft including the goals, policies and <br />implementation plan. <br />Also, staff will share feedback received at the Public Information Open House held on June 21, <br />2012. <br />Recommended Action: <br />Discuss Storm Water Management Plan Update <br />Attachments: <br />A. Comprehensive Surface Water Management Plan- Draft #1 <br />