Laserfiche WebLink
1 <br />Modify driver behavior (reduce speed) <br />2 <br />Modify traffic characteristics (reduce volume) <br />3 <br />Improve safety for pedestrian and bicyclists <br />4 <br />Traffic management can be simplified as a three step process: (1) identify the nature and extent <br />5 <br />ofexisting traffic-related problems on a given street or area (2) select and implement the proper <br />6 <br />strategy for reducing the identified problemand (3) evaluate effectiveness, accept, modify or <br />7 <br />revert.The traffic management strategies discussed inthis document are solutions to a <br />8 <br />narrowly defined set of problems and are not universallyapplicable or effective at solving all <br />9 <br />problems. A traffic management strategy used inthe wrong application will not improve <br />10 <br />conditions - it will only increase City costs and mayeven make conditions worse. <br />11 <br />Since not all strategies are appropriate for every problem the City has developed a process to <br />12 <br />identify the appropriate solutions. The process includes identifying the problem, evaluating <br />13 <br />potential strategies, and implementing appropriate strategieswhile including publicparticipation <br />14 <br />and governmental approval.This process is summarized in Section 4. <br />15 <br />Many traffic management strategiescan be expensive and create inconvenience. A broad base <br />16 <br />of support is necessary. Poor planning, lack of neighborhood input, and/or support can result in <br />17 <br />controversy and divide neighborhoods. <br />18 <br />The process and strategies included in this document are intended to be used on Local Streets <br />19 <br />to reduce speeds and volumes. The goal is promote safety for all public right of way users. <br />4.0 Procedure Summary <br />20 <br />21 <br />A flow chart, Exhibit 1, provides a summary of the procedures for implementing a traffic <br />22 <br />management strategy on a Local Street.What follows is a summary of the procedure. For a full <br />23 <br />description of these steps see Section 5.0 Procedure Details. <br />Step 1 -Study Request (Application) <br />24 <br />25 <br />First citizensmust identify candidate streets for traffic management improvement and submit a <br />26 <br />writtenrequest to the City Engineering Division.Any requests for project proposals require a <br />27 <br />written application with 51% of the Project Neighborhoodsigning the application. Appendix B <br />28 <br />provides a sample petition. <br />Step 2 -Preliminary Review and Evaluation <br />29 <br />30 <br />The City Engineering Divisionwill review requests and determine whether they can behandled <br />31 <br />as part of theadministrative traffic engineering procedures, construction design process,or <br />32 <br />police enforcement function of theCity or if they qualify for consideration under the <br />33 <br />Neighborhood Traffic Management Program. <br />Step 3 -Data Collection and Traffic Study <br />34 <br />35 <br />If it is determined that the request falls under the Neighborhood Traffic Management Program <br />36 <br />the Citywill undertake an engineering study of the street(s) or neighborhood includinggathering <br />37 <br />relevant data of the affected streets. <br />Step 4 -Develop/Evaluate Traffic Management Strategies <br />38 <br />39 <br />Based on the traffic study and input from other departments, the City Engineering Divisionwill <br />40 <br />make a preliminary determination of the need for traffic management strategiesand make <br />41 <br />recommendations as to which strategy would be appropriate. <br />4 City Council Review Draft- 6/29/12 <br /> <br />