Laserfiche WebLink
install a driveway connecting their site to the new Mt. Ridge Road. <br />31 <br />Additional street excavation- unsuitable soil removal and sub grade stabilization was <br />32 <br />required in the section of Twin Lakes Parkway between Cleveland and Mt. Ridge. <br />33 <br />Work on the reuse system: The vault installed for the water reuse system flooded, and <br />34 <br />had to be retrofitted with a sump pump system. Also, some of the equipment within the <br />35 <br />vault needed to be replaced. <br />36 <br />This project was financed using TIF balances and the Metropolitan Transit’s Urban Partnership <br />37 <br />Agreement funds from the Parking Ramp construction project. <br />38 <br />SR <br />TAFF ECOMMENDATION <br />39 <br />The work that was completed was in accordance with project plans and specifications, staff <br />40 <br />recommends the City Council approve a resolution accepting the work completed as the Twin <br />41 <br />Lakes Infrastructure Improvements- Phase 1, authorizing final payment, and starting the one- <br />42 <br />year warranty period. <br />43 <br />RCA <br />EQUESTEDOUNCILCTION <br />44 <br />Approve the resolution accepting the work completed as Twin Lakes Infrastructure <br />45 <br />Improvements- Phase 1, authorizing final payment, and starting the one-year warranty period. <br />46 <br />Prepared by: Debra Bloom, City Engineer <br />Attachments: A: Resolution <br /> B: Certification from City Engineer <br />Page 2 of 2 <br /> <br />