My WebLink
|
Help
|
About
|
Sign Out
Home
2012-07-24_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2012
>
2012-07-24_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2012 3:29:47 PM
Creation date
7/19/2012 3:24:58 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/24/2012
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Process <br />The Pathway Advisory Committee's process for the development of this updated document <br />started with the review of the existing Pathway Master Plan to determine if the plan continues to <br />reflect Roseville's pathway needs. They also were asked to determine if the existing plan <br />policies and standards remain in keeping with the community's goals and strategies as defined in <br />the IR2025 Final Report. City staffs role was to provide support and guidance by setting up <br />meetings, gathering information, answering questions, editing the plan, and otherwise assisting <br />the Committee as needed. Many steps were taken during the update process in the update of this <br />document including the identification, analysis, discussion and recommendation of many light <br />traffic transportation issues and elements. <br />Work Plan <br />We anticipate working through the following outline as a work plan for the update process and <br />expect this to require 4 -5 meetings with a completion date of August 2008. <br />1) Background <br />• Review 2003 update version of plan. <br />• Reviewed community issues, demographics, pathway history and current system inventory <br />and operations <br />• Discuss what has been accomplished in last five years <br />2) Analysis <br />• Identify areas of plan in need of update <br />• Discuss Imagine Roseville 2025 goals and strategies <br />• Review guidelines from federal and state agencies <br />• Design Guidance Accommodating Bicycle and Pedestrian Travel: A Recommended <br />Approach (FHWA) This an other light traffic resources are available online at: <br />http: / /safety.fhwa.dot.gov /ped_ bike /index.htm <br />• Mn/DOT Bikeway Facility Design Manual. This and other light traffic resources are <br />available online: http: / /www.dot.state.mn.us /bike/ and http: / /www.dot.state.mn.us /peds/ <br />3) Development <br />• Update general policy statements for each category <br />i) Location <br />ii) Connection <br />iii) Implementation <br />iv) Maintenance <br />• Education / Information / Regulation <br />• Determine system revisions/ needs based on revised policies <br />• Prioritize needs <br />• Develop Capital Improvement Plan (CIP) <br />• Compile information into document <br />City of Roseville Pathway Master Plan <br />September 2008 Page 7 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.