Laserfiche WebLink
City of Roseville Pathway Master Plan <br />September 2008 Page 27 of 39 <br />Project Name <br />Description <br />19 <br />Dale Street North <br />The construction of an off - street trail from S. Owasso <br />Blvd to County Road C. <br />20 <br />Dale Street South <br />The construction of an off - street trail from Reservoir <br />Woods Park to Larpenteur Avenue. <br />21 <br />Rice Street <br />Develop an on- road and off -road pathway from <br />Larpenteur to the north City boundary. . <br />22 <br />Brenner to Langton <br />Develop a pathway connection between Brenner Ave and <br />Connection <br />Langton Lake Park. <br />23 <br />Langton Lake Loop <br />Develop a pathway that goes around all of Langton Lake. <br />24 <br />Twin Lakes Redevelopment <br />Develop pathway facilities, both on and off road, as a part <br />Area Connections <br />of public street infrastructure project within Twin Lakes <br />Redevelopment area (between Fairview and Cleveland). <br />Provide connection from the redevelopment area into <br />Langton Lake Park. <br />25 <br />NE Diagonal RR Connection <br />Develop a trail connection between Cleveland Avenue and <br />(Walnut to Co Rd C) <br />Walnut Street along County Road C or along the Railroad <br />right- of- way south of County Road C. <br />26 <br />Rosedale to HarMar <br />A light traffic overhead bridge structure across Highway <br />Connection <br />36 and pathway connection between Rosedale and Har <br />Mar Mall. <br />27 <br />Heinel Drive Connection <br />Develop a pathway connection between S. Owasso Blvd <br />and County Road C along Heinel Drive <br />28 <br />Judith to Iona Connection <br />Develop a pathway connection between Judith Ave and <br />Iona Lane. <br />29 <br />Lovell to Minnesota <br />Develop a pathway connection between Lovell Ave and <br />Connection <br />Minnesota Street. <br />30 <br />Villa Park Connections <br />Develop a pathway connection from Shryer Ave and from <br />Ryan Ave into Villa Park <br />31 <br />Millwood to County Road <br />Develop a pathway connection that creates a link between <br />C2 Link <br />the corner of Millwood and Chatsworth through the <br />Ramsey County open space to County Road C2. <br />32 <br />Eustis to St. Croix <br />Develop a pathway connection between Eustis Street and <br />Connection <br />St. Croix Street. <br />33 <br />Cohansey St to HANC <br />Develop a pathway connection between Cohansey Street <br />Connection <br />and HANC. <br />34 <br />Alta Vista Drive <br />Develop a pathway connection along Alta Vista Drive <br />between Larpenteur Avenue and Reservoir Woods Park. <br />City of Roseville Pathway Master Plan <br />September 2008 Page 27 of 39 <br />