My WebLink
|
Help
|
About
|
Sign Out
Home
2012-07-24_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2012
>
2012-07-24_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2012 3:29:47 PM
Creation date
7/19/2012 3:24:58 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/24/2012
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment D <br />October 26, 2011 Draft #2 <br />Roseville Trail Projects: <br />1. County Rd B2 from Lexington to Rice with connectors to Central Park and Acorn Park <br />$1,000,000 sidewalk on south side, bike lane on both sides <br />Options to reduce cost such as grants or partners should be evaluated. It should be noted that <br />these options may create conditions or criteria that may complicate implementation. <br />2. County Rd B from Eustis Rd to Cleveland' <br />$500,000 logistically tied up with road ownership, <br />Road rebuild at same time would make project feasible to address drainage issues. If <br />transferred to Roseville with $ it would be at least 5yrs <br />"Uncertainty of road transfer makes this project potentially un- implementable within 5 year <br />period. <br />3. Oasis Park— Langton Lake Park connectors <br />$350,000 for bridge and trail C2 to Oasis on existing easement <br />Consider combination with natural enhancements <br />4. Southwest Roseville stormwater upgrades with natural trails <br />$150,000 Stormwater management needs may create opportunity <br />school /park/church concept. The status of stormwater upgrades are uncertain which creates <br />uncertainty in implementing this project. <br />Alternate trail projects for consideration: <br />• Increased bike lane on Victoria from County Rd B to Northern city limits <br />• Enhance Terminal Rd and Walnut Road trail <br />• Partner with Ramsey County For County Rd C connection to Northeast Diagonal Trail <br />• Prior Rd County Rd B to Roselawn <br />• Oakcrest Rd link between Willow Pond Park and Pocahontas Park <br />• Fernwood and Eldridge Rd connecter between Brue Russell, Keller Mayflower, and Lexington <br />Park <br />• Shryer Ave connection between Pioneer Park and Reservoir Woods <br />• Tamarac Park to trail on South side of McCarrons Lake <br />• Hand Ct. to Grandview connector near Materion Park <br />• Matilda Rd connector between Mapleview and Ladyslipper Parks <br />• Valley Park connector to W Owasso Rd trail <br />
The URL can be used to link to this page
Your browser does not support the video tag.