Laserfiche WebLink
10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />+)L)_New development property, or property which has altered its land use within the <br />past three years, shall be assessed at 100% of the city's expense for the <br />improvement <br />4se �e Sewer services shall be assessed on a per service basis at 100% of the city's <br />expense for such services. <br />(4) All side lets 8F ... stage- p�aelsshan be det.. i fled to 19a e Z25 <br />6. Storm Sewer Construction: There shall be no assessments for storm sewer projects not <br />associated with roadwav proiects. <br />-5-7. Watermain Construction <br />(a) Properties currently connected to public watermain will not be assessed for <br />reconstruction or Mai or maintenance proiects. <br />(s�)_Shall be assessed on a front footage basis with all types of land use and zoning <br />being identically assessed. <br />(b)(cl Any watermains in excess of 8 inches in diameter will normally be considered <br />oversized. The added cost for oversizing watermain shall be subtracted from the <br />total cost of the improvement. <br />�e�The result of said subtraction will be the cost to be <br />assessed. This will be divided by the total number of assessable feet to establish <br />the assessment rate <br />Ee)dNew development property, or property which has altered its land use within the <br />past three years, shall be assessed at 100% of the city's expense for the <br />improvement <br />4Lee)_Water services shall be assessed on a per service basis at 100% of the city's <br />expense for such services. <br />(8) All side lets 8F ... gaga- p�eelsskan be dete. i fled to 19a e Z25 <br />4-8 Pathway Construction: There shall be no assessments for the construction of off road <br />pathwayeEieta that are included as a priority segment in the Citv's Pathwav <br />Master Plan. <br />-7-9. Streetlight Installation: <br />(a) Shall be assessed on a front footage basis and as follows: <br />(b) All properties within 150 feet (street frontage) of each light shall be considered <br />for assessment. <br />(c) City staff shall determine the number and locations of lights that could have been <br />installed under the "standard street light' section of the City's Street light policy. <br />The maintenance cost for these lights will be deducted from the overall project <br />cost <br />(d) 100% of the additional costs for an "enhanced street light' project shall be <br />specially assessed. The additional costs for an "enhanced street light' project <br />Assessment Policy Summary Page 3 of 5 <br />6/15/12 <br />