My WebLink
|
Help
|
About
|
Sign Out
Home
2012-08-07_PR_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2012
>
2012-08-07_PR_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2012 12:05:12 PM
Creation date
8/14/2012 11:57:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Natural Resource Projects: <br /> HANC <br /> • Boardwalk replacement to create loop ($500,000) <br /> • HANC facility improvements (siding, storage, consider previous committee recommendations) <br /> ($250,000) <br /> • Vegetation management including buckthorn and purple loosestrife removal as well as prairie <br /> and wildflower garden enhancements ($50,000) <br /> • Signage improvements at entrance ($25,000) <br /> • Partnership with Grasslake Watershed District for evaluation. Assessment, and address if <br /> possible compost water quality effects ($100,000) <br /> • Targeted wetland restoration and potential hydrology ($300,000) <br /> Reservoir Woods <br /> • Prairie restoration with interpretive signage - Large area North of the reservoir and smaller <br /> area East of Dale St. tunnel ($50,000) <br /> • Enhancement of trail network North of reservoir including: signage and maps, limited clearing, <br /> surface preparation ($100,000) <br /> • Buckthorn removal and management — Initial effort using professional services with annual <br /> volunteer efforts to address re-establishment. ($300,000) <br /> • Interpretive sign for record Butternut tree ($100) <br /> Oasis Park <br /> • Remove buckthorn and increase native plant buffer to establish a better connection between <br /> park and pond ($100,000) <br /> Villa Park <br /> • Buckthorn removal and management — Initial effort using professional services with annual <br /> volunteer efforts to address re-establishment. ($100,000) <br /> • Garlic Mustard removal and management ($20,000) <br /> Langton Lake Park <br /> • Buckthorn removal and management — Initial effort using professional services with annual <br /> volunteer efforts to address re-establishment. ($60,000) <br /> System wide <br /> • Invasive species mapping and development of City management plan ($50,000) <br /> • City tree management — planting and removal as per Tree plan ($200,000) <br /> • Develop small natural areas in various parks ($164,900) <br />
The URL can be used to link to this page
Your browser does not support the video tag.