Laserfiche WebLink
ATTACHMENT D <br /> PROPOSAL FORM <br /> PROJECT TEAM <br /> Name of Lead Consultant Firm: <br /> Name of Project Manager: <br /> SCHEDULE <br /> Project Duration (Substantial): (Calendar Days) <br /> Note: The Substantial Duration should include the total time from the Notice To Proceed to substantial completion. <br /> Project Duration (Total Time): (Calendar Days) <br /> Note: The Total Project Duration should include the total time from the Notice To Proceed until final project payment is <br /> made. This includes:permitting,warranties, long lead items,punch list items,commissioning,and final payment,etc) <br /> COST <br /> Final Concept Plans $ (Lump Sum) <br /> Documentation of established <br /> Construction and Design Standards $ (Lump Sum) <br /> Documentation of recommended <br /> Natural Resource and Trail Projects $ (Lump Sum) <br /> Fully update Master Plan Document $ (Lump Sum) <br /> Other Costs $ (Lump Sum) <br /> TOTAL COST $ (Lump Sum) <br /> ---------------------------------------------------------------------------- <br /> Name of Company <br /> Printed Name of Firm Representative Signature of Firm Representative <br /> Phone Fax Date <br /> Page 34 of 40 <br />