My WebLink
|
Help
|
About
|
Sign Out
Home
2012-08-07_PR_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2012
>
2012-08-07_PR_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2012 12:05:12 PM
Creation date
8/14/2012 11:57:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT D <br /> PROPOSAL FORM <br /> PROJECT TEAM <br /> Name of Lead Consultant Firm: <br /> Name of Project Manager: <br /> SCHEDULE <br /> Project Duration (Substantial): (Calendar Days) <br /> Note: The Substantial Duration should include the total time from the Notice To Proceed to substantial completion. <br /> Project Duration (Total Time): (Calendar Days) <br /> Note: The Total Project Duration should include the total time from the Notice To Proceed until final project payment is <br /> made. This includes:permitting,warranties, long lead items,punch list items,commissioning,and final payment,etc) <br /> COST <br /> Final Concept Plans $ (Lump Sum) <br /> Documentation of established <br /> Construction and Design Standards $ (Lump Sum) <br /> Documentation of recommended <br /> Natural Resource and Trail Projects $ (Lump Sum) <br /> Fully update Master Plan Document $ (Lump Sum) <br /> Other Costs $ (Lump Sum) <br /> TOTAL COST $ (Lump Sum) <br /> ---------------------------------------------------------------------------- <br /> Name of Company <br /> Printed Name of Firm Representative Signature of Firm Representative <br /> Phone Fax Date <br /> Page 34 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.