Laserfiche WebLink
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: August 28, 2012 Item No: 5 <br />Item Description: Storm Water Management Plan Update Discussion <br />Background: <br />The City has recently initiated an update to its Comprehensive Surface Water Management Plan <br />(CSWMP) which was originally developed in 1990 and was last updated in 2002. The CSWMP <br />is a document that is required to be updated to maintain consistency with local watershed <br />standards and with the Metropolitan Surface Water Management Act. The CSWMP is a required <br />chapter of the City's overall Comprehensive Plan and establishes the City's vision and practices <br />for managing storm water and surface water drainage throughout the City. The Commission <br />provided feedback to the consultant at last month's meeting after an introduction of the process <br />for this update. Ron Leaf, the Project Manager from SEH will be in attendance to give a brief <br />presentation of the first draft of the plan and to lead the discussion. <br />Attached is the second draft of the CSWMP. Staff would like feedback from the commission <br />regarding the draft including the goals, policies and implementation plan. <br />Recommended Action: <br />Discuss Storm Water Management Plan Update <br />Attachments: <br />A. Comprehensive Surface Water Management Plan- Draft #2 <br />