My WebLink
|
Help
|
About
|
Sign Out
Home
2012-08-28_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2012
>
2012-08-28_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2012 9:33:34 AM
Creation date
8/29/2012 9:24:58 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/28/2012
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
on <br />,�0 o. 3 <br />A s <br />0 m <br />m = <br />< N. <br />m m <br />U) <br />v <br />m <br />v <br />m <br />v <br />v <br />m <br />3 <br />m <br />v <br />r <br />U u <br />M= <br />� N <br />� O <br />� N <br />W N <br />N N <br />Table 14 <br />Implementation Plan <br />Applicable <br />Activity /Project <br />Schedule <br />Location <br />Estimated <br />Goal <br />(Priority) <br />Cost <br />Flood <br />Expand the drainage analysis of the I -35W corridor at Co. Rd. C and evaluate <br />Protection and <br />options for upstream storage /volume reduction potential to alleviate flooding at <br />35W -3 <br />Runoff <br />Cleveland Avenue and the ponds at the highway ramps. <br />Management <br />Flood <br />Protection and <br />Investigate alternatives for the Walsh Lake outlet and/or explore opportunities to <br />Runoff <br />provide upstream volume control at the Midland Hills golf course. <br />WL -6 <br />Management <br />Flood <br />Construct storage capacity within the Fairview Avenue trunk storm sewer drainage <br />Protection and <br />area to alleviate flooding at the Trunk Highway 36 low point and provide system — <br />OP -1 <br />Runoff <br />aide surcharge relief. <br />Management <br />Flood <br />Construct an alternative drainage outlet for the Dellwood /Sherren neighborhood to <br />Protection and <br />the Highway 36 ditch system and/or provide additional storage capacity /volume <br />WP -1 <br />Runoff <br />reduction upstream in the Willow Pond drainage area to provide surcharge relief. <br />Management <br />Coordination <br />and <br />Collaborate with CRWD on improvements for the Villa Park sub - watershed. <br />ML-9 <br />Collaboration <br />Coordination <br />Collaborate with the City of Maplewood and CRWD to resolve storm sewer <br />and <br />capacity issues at Center Street which discharges into the Trout Brook Interceptor <br />TB -2 <br />Collaboration <br />storm system. <br />Coordination <br />Explore with RCWD the potential to incorporate BMPs in the Rosedale Mall area <br />and <br />to reduce flooding and improve water quality. <br />OP -1 <br />Collaboration <br />Surface Water <br />Track load reductions of BMPs in watersheds of impaired waters as a condition of <br />Citywide <br />Protection <br />the requirements for the MS4 NPDES draft 2012 permit and TMDLs. <br />Public <br />Collaborate with Parks and Recreation to create a stormwater exhibit at the Harriet <br />Education and <br />Alexander Nature Center to educate visitors on the impacts non -point sources have <br />LO -8 <br />Outreach <br />on water quality and wildlife. <br />
The URL can be used to link to this page
Your browser does not support the video tag.