Laserfiche WebLink
curb. Underground phone, cable, electric and <br />gas lines will be located by spray painting and <br />placing flags in the boulevard. <br />Access <br />A portion of the western 200 feet ofthe <br />roadway will be removed to construct the storm <br />sewer extension into the cul de sac. The <br />Contractor is required to keep the street <br />passable and provide driveway access <br />whenever possible. The project will be staged <br />so that residents and emergency vehicles will <br />be able to drive on the streets at all times. If <br />you have special access needs, please let us <br />know. <br />Proiect Funding <br />The project will be funded with storm water <br />infrastructure funds; there will be no <br />assessments for this project. <br />Project Contacts: <br />Dan Turner, Project Coordinator <br />(651) 792 -7045 <br />dan.turnerOci.roseville.mn.us <br />Kristine Giga, P.E., Civil Engineer <br />(651) 792 -7048 <br />Kristine .giga(cDci.roseville.mn.us <br />Project webske: <br />htto: /A m . citvofroseville.com2012Drainage <br />Project Area is shaded in yellow <br />