Laserfiche WebLink
Entry sign and improvements with irrigation35,000.00$ <br />Building addition / improvements250,000.00$ <br />HANC wall landscape5,000.00$ <br />Curb Cut @ Wetherston Memorial2,000.00$ <br />Water Fountain @ Memorial10,000.00$ <br />Irrigation$ 15,000.00 <br />HANC Total$ 1,097,000.00$ -$ 1,097,000.00 <br />Howard Johnson <br />Master Plan$ 10,000.00 <br />Play Eq$ 65,000.00 <br />Tennis Court Reconstruction75,000.00$ <br />Replace field fencing60,000.00$ <br />Upgrade field$ 25,000.00 <br />Netting$ 75,000.00 <br />Sign planting area$ 7,500.00 <br />Shade structures (2 @ 1500)30,000.00$ <br />Material Bin$ 5,000.00 <br />Equipment Storage Boxes 1,000.00$ <br />Howard Johnson Total353,500.00$ $ -$ 353,500.00 <br />Keller Mayflower Park <br />Shade Structure$ 15,000.00 <br />Sign Planting area$ 5,000.00 <br />Curb Cut$ 1,000.00 <br />Keller Mayflower Park Total21,000.00$ $ -$ 21,000.00 <br />Langton Lake Park <br />Master Plan$ 35,000.00 <br />Langton Lake Concession Building250,000.00$ <br />Natural Resources Restoration250,000.00$ <br />Play Eq$ 60,000.00 <br />Amenities$ 15,000.00 <br />Shade Structures (2)30,000.00$ <br />Pathway improvements (Across lake and boardwalk)100,000.00$ <br />Sign plantings$ 15,000.00 <br />Material Bin$ 5,000.00 <br />Equipment Storage Boxes (2)2,000.00$ <br />Langton Lake Park Total662,000.00$ 100,000.00$ 762,000.00$ <br /> <br />