Laserfiche WebLink
Valley Park <br />Master Plan$ 10,000.00 <br />Loop pathway$ 25,000.00 <br />Shade structure (2)30,000.00$ <br />Amenities$ 5,000.00 <br />Baseball fencing$ 20,000.00 <br />Sign Planting Area$ 5,000.00 <br />Natural Resource Restoration45,000.00$ <br />Equipment Storage Boxes 1,000.00$ <br />Valley Park Total121,000.00$ 20,000.00$ 141,000.00$ <br />Veterans Park <br />Master Plan$ 15,000.00 <br />Play Equipment$ 65,000.00 <br />Shade structures (2)30,000.00$ <br />Field fencing reconstruction$ 100,000.00 <br />Concession stand250,000.00$ <br />Sign Planting Area$ 5,000.00 <br />Material Bin$ 5,000.00 <br />Equipment Storage Boxes 1,000.00$ <br />Bleacher Pads$ 10,000.00 <br />Veterans Park Total316,000.00$ 165,000.00$ 481,000.00$ <br />Villa Park <br />Master Plan$ 20,000.00 <br />Shelter$ 350,000.00 <br />Play Eq$ 65,000.00 <br />Plaza area$ 30,000.00 <br />Hockey boards$ 20,000.00 <br />Villa Bridges$ 75,000.00 <br />Natural Resource Restoration150,000.00$ <br />Shade Structures (3)45,000.00$ <br />Sigh Planting areas$ 15,000.00 <br />Equipment Storage Boxes 1,000.00$ <br />Villa Park Total$ 20,000.00751,000.00$ 771,000.00$ <br />Willow Pond Park <br />Master Plan$ 15,000.00 <br />Natural Resource Restoration50,000.00$ <br />Amenities$ 10,000.00 <br />Shade Structures (2)30,000.00$ <br />Sign Planting$ 7,500.00 <br />Willow Pond Park Total112,500.00$ $ -$ 112,500.00 <br />Woodhill Park <br />Master Plan$ 5,000.00 <br />Natural Resource Restoration15,000.00$ <br />Sign planting area$ 5,000.00 <br />Woodhill Park Total$ -25,000.00$ 25,000.00$ <br />ARTIFICIAL TURF ???????? <br />Total All Parks$ 18,139,500.00 <br />Total Immediate Needs$ 14,974,500.00 <br />Total Future Needs$ 3,165,000.00 <br /> <br />