My WebLink
|
Help
|
About
|
Sign Out
Home
2002 Draft Natural Resources Management
Roseville
>
Studies, Task Forces, Special Committees, Reports
>
Parks and Recreation
>
2002 Draft Natural Resources Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 12:44:46 PM
Creation date
10/5/2012 3:03:36 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 5.5 (continued)— Managerttent options matrix for Bennett Lake <br />Activit Phase Estimated Cost Comments <br />Modify priority 3 $10,000 - Ponds BL-4, BL-5, and WP-1 look like <br />upstream ponds Eo $200,000 candidates. New ponding in direct <br />increase removal depending on drainage also desirable but likely not <br />efficiency whether water acceptable. Conduct feasibility study to <br />level increase or determine engineering feasibility, costs, <br />excavation is and benefits. Approval needed from MN <br />necessary DNR if pond is designated protected <br />water. <br />Implement whole- 3 $15,000 - Only makes sense if cl�w is brou;ht under <br />Lake alum $25,000 control anc! watershed inputs are <br />treatment minimized to extent practicable. <br />Additional sediment sampling desirable. <br />Permits needed frorn state for application, <br />one time a ]ication allowed. <br />City of Roseurlle j7 <br />Par•ks Nati�rad Resource Managenaent <br />
The URL can be used to link to this page
Your browser does not support the video tag.