Laserfiche WebLink
Public Works <br />Engineering and Construction <br />Major Findings <br />• Rose�ille's engineering s#aff could absorb much of #he general engineering wo�cload which <br />is being contracted out by Falcon Heights. <br />- Falcon Heights estimates these costs at about $9,000 per year. <br />From 1992 to 1994, Falcon Heights estimates that engineering costs for their Street <br />Improvement Program will be about $34,000 per year. Roseville believes that this work <br />could be combined with their own improvement program without adding additionai <br />employees. <br />• Roseville's construction engineering demands will diminish after the next 3 years as <br />Phase I of the Pavement Management Program is completed. <br />Falcon Heights' road construction plans could be merged with Roseville's <br />pavement management program to maximize utilization of current engineering <br />staff and potentially reduce some con#racted engineering costs. <br />Because of professional liability issues, Roseville would not provide engineering to Falcon <br />Heights on a contractual basis. <br />43 <br />ROS-04i7 - 3430 - Working Dralt <br />