Laserfiche WebLink
Public Works �lajor Findings <br />Snow Remo�al <br />1990 - 1991 Roseville Falcon Heights <br />Number of Plowing 4ccurrer�ces 11 14 <br />Number of Sand'+ng Only Occurrences 4 4 <br />Number of Hours <br />of Plowing/Sanding 1,690 � 65.5 <br />Average Snowplowing <br />Cost per Hour $68.31 $94.54 <br />• If current service levels were maintained, Faicon Heights could save about $4,340 per year in reduced <br />plowing costs by merging or contracting with Roseville. <br />� 1# Falcon Heights' number of plowing incidents was reduced to Roseville's, there would be a combined <br />savings of about $5,520 per year. <br />• Roseville's street department estimates that they could assume Falcon Heights snow plowing wi#h <br />minimal additional cap+tal outlay ($2,000 -$3,000 one time cost). <br />ROS-04i7 - 3430 - Working Draft <br />45 <br />