My WebLink
|
Help
|
About
|
Sign Out
Home
1991 Report
Roseville
>
Studies, Task Forces, Special Committees, Reports
>
1991 Cooperative Opportunities Falcon Heights Roseville
>
1991 Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 1:10:16 PM
Creation date
10/11/2012 2:49:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works <br />Service Level Indicators <br />Service Area <br />Road Cons#ruction <br />Assessment Policy <br />Roseville <br />Miles of Road Construc�ion <br />•�;�;�•� � <br />. - <br />1991 Road Construction Planned: <br />$ 358,890 Engineerins & Inspection <br />�$�,2 ,�Q Labor & Materials <br />2,537,180 <br />5.18 Miles <br />25% Resident <br />75% City funded <br />Average $12 per frontage �oot for <br />resident (replacement cost) <br />Storm sewer: $500 - 700 per Eot <br />if never previously assessed for <br />storm sewer <br />ROS-o41 � - 3430 - Worlci�g Draft <br />54 <br />Falcon Heights <br />Miles of Road Construction <br />.;: ..� <br />� <br />199� Road and Storm Sewer <br />Construction Planned: <br />$ 91,980 Engineering & Inspection <br />657.00Q Labor. & Materials <br />$748,980 <br />0.78 Miles <br />50% Residen# <br />50% City and MSA funded <br />Average $24 per frontage foot <br />for resident <br />S#orm sewer: Averages $375-$600 <br />per lot, depending on front footage <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.