My WebLink
|
Help
|
About
|
Sign Out
Home
2012_1119_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2012
>
2012_1119_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2012 11:37:13 AM
Creation date
11/15/2012 2:58:14 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 10 <br /> <br /> 146 <br />The Rest of the Pr oblem – A 2012 Update 147 <br /> 148 <br />The primary areas of unfinished business from 2011 include Parks, Pathways, Streets, IT, 149 <br />Central Services, and Admin. capita l funding. All of these areas, w ith the exception of Streets, 150 <br />are funded largely with propert y tax dollars. (Streets are f unded primarily with State MSA 151 <br />money and interest from the approximat ely $13 million Street Replacement Fund.) 152 <br /> 153 <br />These areas of unfinished capit al funding represent an additional approximately $93 million in 154 <br />costs, out of the original $218 million identified in 2011. Of that, about $41 million, or about 155 <br />44%, is unfunded based on current funding sources in 2012. 156 <br /> 157 <br />The pieces of the remaining unfunded amount are: 158 <br /> About $17 million of a total of $47 million in co sts for the Street Pavement Management 159 <br />Program (Street PMP). [37% unfunded] 160 <br /> About $9.4 million of a total $28.5 million in cost s for Park Facilities and PIP items 161 <br />[33% unfunded] 162 <br /> About $7 million of Skating Center Facility needs [100% unfunded] 163 <br /> About $4.6 million of a total $5.7 million in Information Technology, Central Services, 164 <br />and Admin Equipment costs [81% unfunded] 165 <br /> About $1.2 million of $4.2 million in costs for the Pathway & Parking Lot Pavement 166 <br />Management Program (PPPMP) [29% unfunded] 167 <br /> About $355,000 of Street Lighting re placement costs [100% unfunded] 168 <br /> 169 <br />It is worth repeating here that these funding le vels are based on optimized replacement schedules 170 <br />and lists of ongoing capital repl acement needs, as reflected in the 2012-2031 Capital 171 <br />Improvement Plan. 172 <br /> 173 <br /> 174 <br />The Rest of the Solution – 2012 Subcommittee Recommendations 175 <br /> 176 <br />Part of the Solution: The Park Renewal Plan 177 <br /> 178 <br />In terms of Pathways and Park Facilities, a significant part of the solution is already being 179 <br />implemented through the Park Renewal Plan. The ne xt four years of the Park Facility CIP needs 180 <br />and Park Improvement Plan needs, as well as about $2 million in new pathway construction, are 181 <br />included in the Park Renewal Plan projects. 182 <br /> 183 <br /> 184 <br />The Rest of the Solution: 8 Years of Proposed Actions 185 <br /> 186 <br />Generally, the proposals that follow will fund capita l needs through either or both of 2 means: 187 <br />Repurposing existing property tax levy funds th at are now collected for other purposes, and 188 <br />additional property tax levy funding. 189 <br /> 190 <br /> 191
The URL can be used to link to this page
Your browser does not support the video tag.