Laserfiche WebLink
Page 2 of 3 <br />36 <br />37 The Second Part of the Recommendation <br />38 <br />39 Utility Needs, <br />40 <br />41 Background The fee - supported Utilities in the City with significant un- funded capital needs are <br />42 the Water Utility, the Sanitary Sewer Utility, and the Stormwater Uitity. These utilities all <br />43 consist largely of underground piping systems that were installed over a period from the 1940's <br />44 to the 1970's as the City developed In addition, the Water Uitilty includes the City's water <br />45 tower, and the Stormwater Utility includes a number of City- maintained stormwater management <br />46 ponds. This capital infrastructure is provided by the City to deliver safe drinking water to the <br />47 homes and businesses in the City, to take away sanitary sewer wastewater to the Metropolitan <br />48 Council's sewer system and treatment facility for safe treatment, and to safely collect stormwater <br />49 run ofl; treat it, and deliver it to the environment via the streams, lakes, and other waterways of <br />50 the area. <br />51 <br />52 Much of the piping in these systems is approaching 50-60 years of age, and was made of <br />53 materials that have been found to not last much longer than that if even that long. The cast iron <br />54 of the water mains is brittle and subject to leaking and breaks as the result of ground shifting <br />55 tree roots, etc. The clay tile of the sanitary sewer lines is similarly subject to leaks and bring. <br />56 Since the City pays St. Paul for drinking water, each leak or break in a line costs the City's <br />57 residents and businesses higher rates to account for that un -used water we purchase. Leska of <br />58 raw sewage into the ground pose a danger to the environment. <br />59 <br />60 In an effort to keep current and future costa down, the City is using new materials and <br />61 technologies to replace or repair existing water and sewer mains. Where City streets are being <br />62 completely replaced, the water and sewer lines are being replaced (as needed) with more durable <br />63 materials. Where streets are not programmed for replacement for many years, the City is using <br />64 re- lining technology that puts a new plastic pipe inside the existing pipe, and does not require <br />65 excavation of the street. <br />66 <br />67 The capital infrastructure funding gap over the next 20 years in these Utility funds is about $47 <br />68 million out of total projected costs of $65 million. In other words, 72% of the projected costs are <br />69 currently un- fimded. <br />70 <br />7I Recommendation The subcommittee recommends a long -term solution for funding the <br />72 significant capital replacement needs of these Utilities that is a combination of adding revenues <br />73 and transferring existing funds. <br />74 <br />75 The first part of the recommendation is to increase the annual utility base fees by a total of $2.2 <br />76 million in 2012, and to maintain that increase permanently going forward Approximately <br />77 $850,000 of that amount would be dedicated to Water Utility capital funding, approximately <br />78 $830,000 to Sanitary Sewer Utility capital funding, and the remaining approximately $500,000 <br />79 would be dedicated to Stormwater Utility capital finding. <br />80 <br />