Laserfiche WebLink
Member DeBenedet advised that, knowing that recommendation, Finance <br /> Director Miller would then formulate how to make it revenue-neutral. <br /> Mr. Schwartz noted that base rates are at a fixed rate for a quarter, and as now set <br /> up essentially represented operating costs for the water utility (e.g. fixed cost and <br /> depreciation). Mr. Schwartz advised that the consumption rate was simply a pass- <br /> through based on the amount charged Roseville by the St. Paul Water Utility. <br /> Member DeBenedet moved, Member Stenlund seconded, the PWETC's <br /> recommendation to the City Council the following three (3)tier adjustment to <br /> water rate structures for 2013: <br /> 0 = 16,000 gallons per quarter <br /> 16,000—24,000 gallons per quarter <br /> 24,000 gallons and above per quarter <br /> Member DeBenedet noted that the concept was that the rate for use under 16,000 <br /> gallons would be reduced, but the higher tiered rates higher; all with the intended <br /> impact to obtain a revenue-neutral fee for Roseville residential customers; with no <br /> recommended changes for commercial customers. Member DeBenedet opined <br /> that commercial users only used the water they required; but had little <br /> discretionary use beyond irrigation. <br /> Ayes: 5 <br /> Nays: 0 <br /> Motion carried. <br /> 9. 2013 Construction Work Plan <br /> Mr. Schwartz displayed and briefly reviewed locations of the proposed 2013 work <br /> plan for reconstruction and/or mill/overlay projects. Mr. Schwartz advised that <br /> staff would present the proposal to the City Council at their November 19, 2012 <br /> meeting seeking their direction, for projects ranging from pathways, water main <br /> replacement (on Transit Avenue from Western to Rice) and water main <br /> replacement (from Transit Avenue to County Road Q. Mr. Schwartz advised that <br /> staff continued to refine the numbers; however, the scope of proposed 2013 <br /> projects would be slightly reduced from that of 2012, with only about a half mile <br /> of reconstruction and 2 miles of mill/overlay. <br /> Mr. Schwartz noted the City essentially completely reconstructed the City street <br /> system in the last 25 to 30 years; and the current pavement condition index ratings <br /> in the upper 70's to low 80's. Mr. Schwartz advised that pavement throughout the <br /> street network appeared to be performing well; however due to other department- <br /> wide proposed work, staff had still outlined a significant work load for 2013 in <br /> the range of$3 —4 million of projects. Mr. Schwartz advised that one of those <br /> projects would include a grant application submitted to the Metropolitan Council <br /> for inflow and infiltration work(I& I)for lining 6-7 miles of sanitary sewer in <br /> 2013, representing a significant amount of work. <br /> Page 14 of 17 <br />