My WebLink
|
Help
|
About
|
Sign Out
Home
2012_1210_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2012
>
2012_1210_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2012 11:30:24 AM
Creation date
12/6/2012 4:30:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 20 1 3 Fee Schedule <br /> 1 <br />D. Maximum fee for single -family dwelling shall not exceed $150.00 if not over 16 <br />200 -ampere capacity. This includes service, feeders, cir cuits, fixtures and 17 <br />equipment. The maximum fee provides for not more than two rough -in 18 <br />inspections and the final inspection per dwelling. Additional inspections are at 19 <br />the re -inspection rate. 20 <br /> 21 <br />E. Maximum fee on an apartment building shall not exceed $7 0.00 per dwelling 22 <br />unit. A two -unit dwelling (duplex) maximum fee is charged per unit as separate 23 <br />single -family dwelling s . 24 <br /> 25 <br />F. The maximum number of 0 to 30 ampere circuits to be paid on any one athletic 26 <br />field lighting standard is 10 . 27 <br /> 28 <br />G. In addition to the above fees: 29 <br /> - A charge of $4 .00 will be made for each street lighting standard. 30 <br />- A charge of $7 .00 will be made for each traffic signal standard. Circuits 31 <br />originating within the standard will not be used when computing fees. 32 <br /> 33 <br />H . In addition to t he above fees, all transformers and generators for light, heat and power 34 <br />shall be computed separately at $8.00 plus $.40 per KVA up to and including 100 35 <br />KVA. 101 KVA and over at $.30 per KVA. The maximum fee for any transformer or 36 <br />generator in this categ ory is $80.00. 37 <br /> 38 <br />I. In addition to the above fees, all transformers for signs and outline lighting shall 39 <br />be computed at $8 .00 for the first 500 VA or fraction thereof per unit, plus $.70 40 <br />for each additional 100 VA or fraction thereof. 41 <br /> 42 <br />J . In addition t o the above fees (unless included in the maximum fee filed by the 43 <br />initial installer ) remote control, signal circuits and circuits of less than 50 volts 44 <br />shall be computed at $.75 per device. 45 <br /> 46 <br />K . In addition to the above fees, the inspection fee for each sep arate inspection of a 47 <br />swimming pool shall be computed at $35 .00. Reinforcing steel for swimming 48 <br />pools requires a rough -in inspection. 49 <br /> 50 <br />L. For the review of plans and specifications of proposed installations, there shall 51 <br />be a minimum fee of $150.00 up to a nd including $30,000 of electrical estimate, 52 <br />plus 1/10 of 1% on any amount in excess of $30,000 . T o be paid by permit 53 <br />applicant. 54 <br /> 55 <br />M. When re -inspection is necessary to determine whether unsafe conditions have 56 <br />been corrected and such conditions are not subj ect to an appeal pending before 57 <br />any Court, a re -inspection fee of $35 .00 may be assessed in writing by the 58 <br />Inspector. 59 <br /> 60 <br />N. For inspections not covered herein, or for requested special inspections or 61 <br />services, the fee shall be $3 5 .00 per man hour, including travel time, plus $.25 62 <br />per mile traveled, plus the reasonable cost of equipment or material consumed. 63
The URL can be used to link to this page
Your browser does not support the video tag.