<br />Project P -ST -SW -W -13 -02 Feasibility Report <br />County Road D Reconstruction <br />23 <br />PROPOSED FUNDING A. Special Assessments <br />State Statute 429 has two major points to consider when justifying assessments, first, the <br />assessment has to treat similar properties equally, and second, the amount of the as sessment <br />has to be equal to or less than the resulting increase in property value. Assuming this project is <br />completed by fall 20 1 3 , the final assessment amount would be determined following an <br />asses sment hearing in the fall of 201 4 and a thorough review o f the proposed assessments by <br />the Council. T he following City of Roseville assessment policies are being followed: <br />• To meet MSA standards, this road will be constructed to a 10 -ton design . <br />o For the purpo ses of assessment calculation, the estimated quantit ies are reduced to <br />reflect the cost to build a 7 -ton road . (7 ton road design is 6 inches of aggregate <br />base material with 3 inches of new bituminous pavement ). <br />o Since the proposed road is 33 feet wide, the costs for the additional 1 foot of <br />pavement are su btracted as well. <br />• Property zoned LDR1 and LDR2 shall be assessed up to 25% of the cost of a 7 -ton, 32 -foot wide <br />pavement with concrete curb and gutter and required drainage. <br />• All other property zoning shall be assessed up to 50% of a 7 -ton, 32 -foot wide pav ement with <br />concrete curb and gutter and required drainage. <br />• Co sts associated with sidewalk construction are not assessed to property owners. These costs <br />are funded using MSA funds. <br />• Sanitary and Watermain replacement/repair will be funded by the appropriat e utility fund and <br />not become part of the assessable portion of the project. <br /> <br />Assessment Summary <br />Estimated total street construction cost with required drainage $577,816.53 <br /> <br />Estimated 7 -ton, 32 ft wide , street construction cost - with <br />required drainage $540,794.40 <br />Total Assessable Frontage 2 ,214.13 <br />Assessment Rate <br />100% of cost/foot $244.25 <br />5 0 % of cost/ foot $122.13 <br />25% of cost/ foot $61.06 <br /> <br />• Appraisals will be completed prior to the Public Hearing to determine the influence of the <br />improvement pro ject on the value of the properties proposing to be assessed. <br />• If appraisals indicate that the “up to” assessment rate is greater than the benefit received from <br />the proposed project, Staff will recommend that the assessment rate be lowere d to equal the <br />benefit.