Laserfiche WebLink
City of Roseville 2013 Fee Schedule <br /> Building Permit and Plan Review Fees- continued <br /> Investigation Fee: Work without a Permit <br /> Whenever any work for which a permit is required from the city has been commenced without <br /> first obtaining said permit, a special investigation shall be made before a permit may be issued for <br /> such work. An investigation fee, in addition to the permit fee, shall be collected whether or not a <br /> permit is then or subsequently issued. The investigation fee shall be equal to the amount of the <br /> permit fee required by this code. The payment of such investigation fee shall not exempt any <br /> person from compliance with all other provisions of this code nor from any penalty prescribed by <br /> law. <br /> Manufactured Home Permit Fee: <br /> New installation $ 260.00 $ 260.00 <br /> Mechanical Permit Fee - Residential: <br /> ,`� <br /> Air conditioning-new $ 45.00 $ 46.00 <br /> Air conditioning-replacement 57.00 58.00 <br /> Warm air furnace-new 95.00 97.00 <br /> Warm air furnace- replacement 57.00 58.00 <br /> Hot water boilers-new 95.00 97.00 <br /> Hot water boilers-replacement 57.00 58.00 <br /> Unit heaters 57.00 58.00 <br /> Swimming pool heaters 57.00 58.00 <br /> Misc. work& gas piping 1.28%of job cost 1.28%of job cost <br /> Minimum fee 57.00 58.00 <br /> Gas fireplace 57.00 58.00 <br /> In floor heat $ 78.00 80.00 <br /> $1.28 % of job cost $1.28 %of job cost <br /> Solar panel installation / $150.00 min fee /$150.00 min fee <br /> Mechanical Permit Fee - Commercial: <br /> 20124 dunt <br /> 1.28% of job cost/ 1.28% of job cost/ <br /> All commercial work $57.00 min fee $58.00 min fee <br /> Moving Permit Fee: <br /> p : 012Amc t 2013 moon; <br /> Over private property only $ 87.00 $89.00 <br /> Over public streets 127.00 130.00 <br /> Investigation fee per hour $64.50 $64.75 <br /> 10 <br />