Laserfiche WebLink
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: January 22, 2013 Item No: 5 <br />Item Description: Traffic Signal / Intersection Discussion <br />Background: <br />At the November PWETC meeting, the commission members asked a number of questions <br />regarding signals and pedestrian timing. The Commission specifically discussed the Fairview <br />signals within the NESCC pathway corridor. It was requested that staff include this topic on a <br />future meeting. <br />We have asked Mike Spack, Spack Consulting, to provide the Commission some background on <br />traffic signals, timing, and pedestrians. He is a Professional Traffic Operations Engineer (PTOE) <br />and assisted the City on the signal design for the NESCC project. He will be providing the <br />commission with some information regarding MnDOT and Ramsey County timing practices. <br />From the meeting minutes: <br />"Discussion included updated intersection signal lights for bicycles and pedestrians, both those <br />already installed and those still needed at various locations throughout the City; clarification by <br />staff on "free rights" near Rosedale entrances with no crosswalks at those locations in accordance <br />with MnDOT practice; and how push buttons provide clearance for pedestrians and /or bicycles <br />on Ramsey County roads in particular (e.g. pre - emption for signals). <br />Members concurred that they would like to have additional discussion at a future meeting on <br />theory /priorities /best practices for design of pedestrian crossings, as well as implications related <br />to those designs, including legal, ADA, best practices, and safety considerations. Chair <br />Vanderwall opined that this design information was important for the Commission, as well as the <br />public, to understand to have all perspectives outlined." <br />Recommended Action: <br />Discuss Traffic Signals/ Intersections <br />Attachments: <br />None <br />