Laserfiche WebLink
❑ Met with siX firms to gather pre request for proposal (RFP) <br />information. Plan to discuss further with Parks and Recreation <br />Commission at an upcoming meeting. �a �ios <br />❑ Working on Pathway Master Plan Build Out Plan w/PWET <br />Commission and Parks & Rec Commission DS 7/12 <br />Include shade pavilions and/or park ❑ Will be incorporated into the anticipated Master Plan process to <br />shelters at all parks to promote determine need and locations. LB �ios <br />neighborhood connections and <br />accommodate neighborhood gatherings <br />Revise water rates from use base to <br />conservation base incentives for 10-20% <br />reduction in residential and business <br />usage <br />Fund Citywide traffic model <br />Encourage development of transit, <br />walkability and alternate transportation <br />❑ Ann�1nl Ralc cidir�shnent,s bein� mct�le Continued rfiscu.rsion in No>>ember, _701? CM l0/ <br />❑ For 2009, adopted a conservation-based rate structure to encourage <br />water conservation and greater transparency in actual costs. cnr3io9 <br />a <br />oo�;,�R A,-,1-;..;,..,40 (`.�.,,,-,�.;1 a;�l.,,��;.�.,-, RT�..,o,v,L.o« �nn4 n� ininn <br />� � <br />�m''T��� ��@H�€�����7�Y <br />B ' <br />� <br />��,-.,..�,,,-o ;� l,o.,..;1.. .ao,�o,,.lo,�� �.,, l,;Rl, . .,�v,-, � ��, � .,«� „�;1;�.. <br />.,�;,,,, t,., r�;i �ni n �,n, ����u <br />❑ No new activity Ds 6io9 <br />❑ No new activity (funding challenges). r�s 3io9 <br />❑ No new activity. �s loio8 <br />❑ CIP discussion item. �s �ios <br />❑ Joint Cominittee of the Parks and Recreation Conlmission and PWET <br />established to review and prioritize trails and natural resources poi-tion <br />of the Parlt and Recreation Renewal Pro�ram — LB 10/12 <br />❑ Established a citizen trails and natural resources work group as part of <br />master plan implementation program Ls �oi�r <br />❑ Reviewing concept for new Park N Ride facility in Little Canada at <br />Rice St. and HWY. 36 osai» <br />❑ City Awarded LCDA grant for construction of trail from Sienna <br />Green to County Road B. Construction expected in 2011. PT6i�o <br />❑ Draft of new residential and commercial zoning codes promotes <br />design that promotes walkability. PT�no <br />❑ Staff, in conjunction with AEON, has applied for an LCDA grant <br />from Metropolitan Council far a grant to construct a sidewalk from <br />Har Mar Apartments to County Road B which dramatically improve <br />walkability and access for the residents of the Har Mar Apartments to <br />local stores and transit options. PTlzi <br />❑ Staff is planning on sending out RFPs for the new zoning code in <br />September. PT9in9 <br />❑ Rice Street Interchange design will incorporate bike and ped facilities <br />into the design and have discussed transit needs with Met Council. �s <br />6/09 <br />❑ In anticipation of designing a new zoning code, staff, the Planning <br />Commission, and the City Council are reviewing the use of form- <br />based codes for the new zoning code. Form based codes emphasize <br />wallcability and alternative transportation. Pr 6io9 - see also Long Term <br />Goals <br />❑ The City recently approved a new Metro Transit Park and Ride <br />Facility in the Twin Lakes area that will provide access to transit <br />ServlCes. PT 3/ov - see also Long Term Goals <br />