Laserfiche WebLink
Add buses and routes for flexibility and <br />suburb-to-suburb travel <br />Encourage development of transit, <br />walkability and alternate transportation <br />Work w/ Metro Transit to identify <br />location of long-term park-n-ride facility <br />❑ Roundabout included in Phase I Twin Lakes improvements <br />construction 2009. �s 3io9 <br />❑ No new activity. ns loios <br />❑ Look into ROW requirements and identify possible corridors 2009. Ds <br />�ios <br />❑ Metro Transit evaluation Bus Rapid Transit for Snelling Ave. and <br />other service to area including a new Park N Ride facility in Little <br />Canada Dsai�l <br />❑ Have had additional discussion with Metro Transit regarding <br />additional service to Park N Ride �sailo <br />❑ No new activity �s 6io9 <br />❑ Explore opportunities created by new Park N Ride �s 3io9 <br />❑ Discussed this flexibility with Metro Transit for Twin Lakes Park N <br />Ride facility. �s loios <br />❑ Continue to push this issue in all discussions with Metro Transit. �s <br />�ios <br />❑ Participating in Bus Rapid Transit Study for Arterial Corridors <br />including Snelling Avenue �s �i», os �iiz <br />❑ Provided feedback to Metro Transit on proposal for additional Park N <br />Ride facility in Little Canada at County Road B and Rice St ossi�o <br />❑ Draft of new residential and commercial zoning codes promotes <br />design that promotes walkability. PT�i�o <br />❑ In anticipation of designing a new zoning code, staff, the Planning <br />Commission, and the City Council are reviewing the use of form- <br />based codes for the new zoning code. Form based codes emphasize <br />wallcability and alternative transportation. Pr6io9 <br />❑ No new activity Ds 3io9 <br />❑ The City recently approved a new Metro Transit Park and Ride <br />Facility in the Twin Lakes area that will provide access to transit <br />SeTVICes. PT 3/09 - see also Med Term Goals <br />❑ Included in Transportation section of Comp Plan. �sloios <br />❑ The City has also been working with surrounding communities to <br />promote the development of the Northeast Diagonal as a transit <br />corridor. PT �oios <br />❑ Identify needs in CIP 2009-2018 Meeting with Northeast Diagonal <br />cities to pursue getting corridor back into 2030 Plan. �s �ios <br />❑ These items are being emphasized in the Comprehensive Plan Update <br />with the goal of making alternative forms of a greater priority in the <br />community's growth and redevelopment in the future. PT �ios <br />❑ Park and Ride structure completed and open for business. Pr6i�o <br />❑ Under construction. EXpected completion by 12/31 /09 PT �io9 <br />❑ Metro Transit relooking at the Rice Street/Hwy 36 area �s 6io9 <br />❑ Approved and open by 12/31 /09 �s 3io9 <br />❑ The City Council approved the Metro Transit Park and Ride facility in <br />December 2008. Construction will commence in the spring of 2009 <br />and will be completed by the end of the 2009. PT3io9 <br />❑ Ongoing. The City Council is currently considering the construction <br />of a new park and ride facility located within Twin Lakes that is <br />expected to replace the spaces at Rosedale Mall after 2011. Staff <br />continues to have dialogue with Metro Transit staff regarding needs <br />for additional park and ride facilities. PT loios <br />❑ Council Consideration of Twin Lakes facility October 2008. �s loios <br />❑ Underway for Twin Lakes, additional future needs along Hwy 36 <br />