My WebLink
|
Help
|
About
|
Sign Out
Home
2012_1022_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2012
>
2012_1022_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 9:06:30 AM
Creation date
1/25/2013 2:12:11 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2012 FEE SCHEDULE <br />The following Fee Schedule is based upon competent, responsible professional services and is the minimum, <br />below which adequate professional standards cannot be maintained. It is, therefore, to the advantage of both the <br />Professional and the Client that fees be commensurate with the service rendered. <br />.. . . <br />Sr. Project Manager - Sr. Principal Engineer/Surveyor $120-150/Hour <br />Sr. Project Manager - Principal Engineer/Surveyor $100-150 <br />Project Manager (Inc. Landscape Architect) $100-145 <br />Senior Planner $100-150 <br />Project/Design Engineer/Planner/Landscape Architect $60-135 <br />Licensed Surveyor $70-135 <br />ProjectSurveyor $60-100 <br />Specialist (Nat. Resources; GIS; TrafFic; Graphics; Other) $70-120 <br />Senior Technician (Inc. Survey') $70-145 <br />Technician (Inc. Survey) $50-90 <br />Administrative Support & Clerical $35-80 <br />GPS/Robotic Survey Equipment NO CHARGE <br />CAD/Computer Usage NO CHARGE <br />Routine Office Supplies NO CHARGE <br />Routine Photo Copying/Reproduction NO CHARGE <br />Field Supplies/Survey Stakes & Equipment NO CHARGE <br />Mileage NO CHARGE <br />' No separate charges will be made for GPS or robotic total stations on Bolton & <br />Menk, Inc. survey assignn7ents; the cost of this equipment is included in the rates for <br />Survey Technicians. <br />Charges are based on hours spent at hourly rates in effect for the individuals performing the work. The hourly <br />rates for Principals and members of the staff vary according to skill and experience. The Fee Schedule shall apply <br />for projects for the period through December 31, 2012. These rates may be adjusted annually thereafter to account <br />for changed labor costs, inflation or changed overhead conditions. <br />These rates include labor, general business and other normal and customary expenses associated with operating a <br />professional business. Unless otherwise agreed, the above rates include vehicle and personal expenses, mileage, <br />telephone, survey stakes and routine expendable supplies; and no separate charges will be made for these <br />activities and materials. Expenses beyond the agreed scope of services and non-routine expenses, such as large <br />quantities of prints, extra report copies, out-sourced graphics and photographic reproductions, document recording <br />fees, outside professional and technical assistance and other items of this general nature, will be invoiced <br />separately. Rates and charges do not include sales tax, if applicable. <br />When it is possible to accurately define the scope of the project and the professional services to be performed, a <br />lump sum may be agreed upon for total compensation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.