My WebLink
|
Help
|
About
|
Sign Out
Home
2013_0128_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2013
>
2013_0128_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 11:34:31 AM
Creation date
1/25/2013 3:04:45 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
590
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION <br />On November 19, 2012, the Roseville City Council ordered the preparation of a Feasibility <br />Report for the Construction of Public Improvements at 3040 Hamline Avenue. This report <br />details that investigation. <br />The proposed project involves: extension of public sanitary sewer and watermain to serve the <br />residential lots, reconstruction of existing sanitary and water services to 3040 Hamline Avenue. <br />It is expected that if this improvement is approved, the work will be completed in 2013 and <br />should take about 3 weeks to complete. The project was initiated by petition; as outlined by <br />state law, projects initiated by petition require a simple majority vote by the City Council for <br />approval. <br />CONCLUSIONS & RECOMMENDATIONS <br />A. All portions of the project proposed are feasible. <br />B. Estimated project cost: <br />Estimated Cost <br />Removals $10,473.33 <br />Restoration $8,650.00 <br />Watermain $15,797.50 <br />Sanitary Sewer $26,727.50 <br />Contingency (10%) $6,164.83 <br />Construction Total $67,813.17 <br />Engineering (15%) $10,171.98 <br />Project Total $77,985.14 <br />The following is a summary of the recommendations discussed in this report. <br />A. Construct the project in 2013 <br />B. Construct 270 feet of watermain to serve the two new lots. <br />C. Construct 200 feet of sanitary sewer to serve the two new lots. <br />D. Fund the project by assessing 100% of the cost to the petitioner. <br />Schedule a public hearing for the project on Monday, February 25, 2013. <br />Project SS-W-13-10 Feasibility Report <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.