My WebLink
|
Help
|
About
|
Sign Out
Home
2013_0128_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2013
>
2013_0128_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 11:34:31 AM
Creation date
1/25/2013 3:04:45 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
590
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��� <br />� <br />REQUEST FOR COUNCIL ACTION <br />Department Approval <br />�. <br />Date: 1/28/13 <br />Item No.: 7.g <br />City Manager A <br />Item Description: Approve a Resolution for the Final Acceptance and Maintenance for <br />Public Improvements Constructed for HIGHCREST PARK ADDITION <br />and HIGHCREST PARK 3rd ADDITION <br />BACKGROUND <br />On July 11, 2011, the City Council approved a public improvement contract for Meritex <br />Enterprises. These improvements are located south of Terminal Road and west of Walnut Street. <br />The contract and subsequent amendment covered the public improvements included in the <br />HIGHCREST PARK ADDITION and HIGHCREST PARK 3rd ADDITION plat. These <br />improvements included the construction of a public sidewalk along the west side of Walnut <br />Street, storm sewer construction and sanitary sewer construction. These improvements were <br />completed in 2012. <br />The City worked with their Engineer during construction to ensure the improvements were <br />installed according to approved plans and City specifications. <br />POLICY OBJECTIVE <br />The City Policy requires the following steps be completed to finalize the construction project: <br />• Certification from the civil engineer in charge of the project verifying that all work has been <br />completed in accordance with the approved plans and specifications. <br />A resolution by the City Council accepting the project and beginning the two-year warranty <br />period. <br />FINANCIAL IMPACTS <br />Since this was a developer initiated project, the City did not participate in the cost to construct <br />these public improvements. <br />STAFF RECOMMENDATION <br />All necessary items have been completed in accordance with project plans and specifications. <br />Since all items have been completed as outlined in the policy regarding final project acceptance, <br />staff recommends the City Council approve a resolution accepting the public improvements. <br />REQUESTED COUNCIL ACTION <br />Approve a Resolution Accepting the Public Improvements Constructed for HIGHCREST PARK <br />ADDITION and HIGHCREST PARK 3rd ADDITION. <br />Prepared by: Debra Bloom, City Engineer <br />Attachments: A: Rcsolution <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.