Laserfiche WebLink
Page 13 of 18 <br />Local Benchmark:Number of Water Main breaks <br />IR2025 Strategy:12.C <br />Description:Number of water main brekas per year <br />3-Year <br />2010 2011 2012 Average 2013 <br />28 29 21 26 - <br />Local Benchmark:Percentage of Lost Water <br />IR2025 Strategy:12.C <br />Description:Percentage of lost water when comparing water purchased to water billed <br />to customers <br />3-Year <br />2010 2011 2012 Average 2013 <br />0.6%4.4%n/a 2.5%0.0% <br />Local Benchmark:Project Engineering cost as a percenta ge of total project construction cost <br />IR2025 Strategy:12 <br />Description:Average for all projects <br />3-Year <br />2010 2011 2012 Average 2013 <br />8.6%11.0%12.0%10.5%0.0% <br />Local Benchmark:Cost per unit for street sweeping <br />IR2025 Strategy:12.A <br />Description:Per linear miles <br />3-Year <br />2010 2011 2012 Average 2013 <br />Spring 347 $ 371$ 254 $ 324 $ -$ <br />Fall 134 $ 176$ 136 $ 149 $ -$ 87 <br /> 88 <br />89