Laserfiche WebLink
4.0B <br />ACKGROUND <br />4.1The subject property, located in Planning District 11, has a Comprehensive Plan Land <br />Use Designation of Industrial (I) and a corresponding zoning classification of Industrial <br />(I) District. The proposal has been prompted by plans to develop an <br />PRELIMINARYPLAT <br />approximately 185,000-square-foot, multi-tenant, office/warehouse facility. Although the <br />applicant and prospective developer have provided some details about the ultimate <br />development intended for the site, the reader should note that the details of the future <br />development are not germane to the consideration of the application; <br />PRELIMINARY PLAT <br />instead, any part of the development proposal which does not conform to the zoning code <br />requirements either would not be permitted or would be required to seek the appropriate <br />approval (e.g., variance or conditional use) as may be necessary. <br />4.2When exercising the so-called “quasi-judicial” authority when acting on a request, <br />PLAT <br />the role of the City is to determine the facts associated with a particular request and apply <br />those facts to the legal standards contained in the ordinance and relevant state law. In <br />general, if the facts indicate the applicant meets the relevant legal standard, then they are <br />likely entitled to the approval, although the City is able to add conditions to a plat <br />approval to ensure that the likely impacts to roads, storm sewers, and other public <br />infrastructure on and around the subject property are adequately addressed. <br />5.0PPA <br />RELIMINARYLATNALYSIS <br />5.1Plat proposals are reviewed primarily for the purpose of ensuring that all proposed lots <br />meet the minimum size requirements of the zoning code, that adequate streets and other <br />public infrastructure are in place or identified and constructed, and that storm water is <br />addressed to prevent problems either on nearby property or within the storm water <br />system. As a of an industrial property, the proposal leaves no zoning <br />PRELIMINARY PLAT <br />issues to be addressed since the Zoning Code does not establish minimum lot dimensions <br />or area. The proposed is included with this report as Attachment C. <br />PRELIMINARY PLAT <br />5.2A small, 17-foot-by-30-foot rectangle in the middle of the northern edge of the property <br />is represented as Parcel 2 within the present , although it was shown to <br />PRELIMINARY PLAT <br />rd <br />be outside of the preliminary plat of the preceding Highcrest Park 3 Addition. Meritex <br />should demonstrate that they own that area prior to consideration of the . <br />FINAL PLAT <br />5.3Roseville’s Public Works Department staff have been working with the applicant to <br />address the typical public needs related to easements as well as attending to details of <br />sewer and water infrastructure. <br />5.4At its meeting of November 1, 2012 Roseville’s Parks and Recreation Commission <br />reviewed the proposed against the park dedication requirements of <br />PRELIMINARY PLAT <br />§1103.07 of the City Code and recommended a dedication of cash in lieu of land. <br />6.0PC <br />UBLICOMMENT <br />The duly-noticed public hearing for this application was held by the Planning <br />Commission on April 3, 2013; no one from the public was in attendance of the public <br />hearing to comment on the proposal, but the draft minutes are included with this staff <br />report as Attachment E. Planning Division staff has received a few phone calls with <br />clarifying questions about the proposal, but no comments have thus far been offered. <br />PF13-004_RCA_041513.doc <br />Page 2 of 3 <br /> <br />