Laserfiche WebLink
<br />th <br />Roseville Housing Replacement Program (HRP) Amended April 16, 2013 <br /> <br />This document has been developed to guide program administration. It should not be interpreted as <br />constituting any contractual agreement or liability by the Rosev <br />Authority (RHRA). The RHRA may modify or divert from the guide <br /> <br />Program Objectives <br />1.To remove substandard, functionally obsolete housing on scattere <br />replace with new, higher-valued, sustainable housing. <br />2.To eliminate the influence of blight of substandard housing, thus improving residential <br />neighborhoods. <br />3.To facilitate the construction of larger owner-occupied homes that have three+ bedrooms, 2+ <br />bathrooms, and a two-car garage that will complement the neighborhood and are designed to <br />expand family opportunities or to serve elderly residents. <br />These objectives will be achieved by the RHRA purchasing and razing substandard homes and selling the <br />lot to a licensed builder or individual for the construction of a single-family, owner-occupied home. <br />Program Basics <br />1.RHRA publishes a list of available vacant lots for purchase including sale price and development <br />criteria. <br />2.A builder with an identified buyer, a buyer with an identified builder, or <br />identified buyer proposes a plan for a lot consistent with development criteria aram <br />requirements and makes an offer to purchase. <br />3.RHRA approves lot sale. <br />4.Lot is sold to Potential Homeowner or Builder/Developer. <br />5.Project is completed within one year after closing. <br />Builder Requirements <br />1. Must be a licensed contractor. <br />2. Must demonstrate financial capabilities by providing: <br />a.A statement from a financial institution of sufficient construct to complete the <br />project. <br />b.Proof of Builders Comprehensive General Liability with Property Damage Protection and proof <br />of sufficient workers compensation insurance coverage by the Builder. <br />c.Written warranty to be provided to the Buyer, which guarantees at minimum, warranted repairs <br />as required by Minnesota State Statute. <br />3. Must provide references from: <br />a.Five satisfied customers <br />b.Building inspectors from two cities where the Builder has constructed new <br />past three years <br />4. Provide an inventory of all homes currently under construction. <br />Housing Design and Site Criteria <br />1.Home design must comply with all federal, state, and local building codes. <br />2.Construction on the home must commence within six months after closing. The project must be <br />100% complete one year after closing. <br />Page 1 Roseville Housing Replacement Program April 10, 2013 <br /> <br />