Laserfiche WebLink
Attachment A <br />Pathway Master Buildout Plan <br />Length <br />Estimated Cost <br />Funding <br />Traffic <br />Score <br />Description <br />(Miles) <br />Retaining <br />Build Year <br />Source <br />Counts <br />On Street Signage Off Road Bridge Striping Drainage Total <br />Scorin per 2008 Pathway Master <br />wall <br />6 <br />County Road B2 <br />140.8 <br />Sidewalk from Lexington Avenue to Rice Street <br />2 <br />$942,000 <br />$330,000 <br />$127,200 <br />$1,399,200 <br />2013 -2015 <br />4,150 <br />On -road and off -road pathway from County Road B <br />17 <br />Victoria St (B to C) <br />129.3 <br />to County Road C <br />1 <br />$258,693 <br />$37,500 <br />$55,000 <br />$351,193 <br />2013 -2015 <br />4,825 <br />Constellation L <br />signage and striping along the route <br />3 <br />$7,500 <br />$6,300 <br />$13,800 <br />2013 -2015 <br />NA <br />Constellation E <br />signage and striping along the route <br />2.25 <br />$5,625 <br />$4,725 <br />$10,350 <br />2013 -2015 <br />NA <br />Constellation B <br />signage and striping along the route <br />1.62879 <br />$4,072 <br />$3,420 <br />$7,492 <br />2013 -2015 <br />NA <br />Contingency (11%) <br />easement/ testing etc. <br />$217,964 <br />Total <br />$2,000,0001 <br />PROPOSED TO BE CONSTRUCTED AS A PART OF PARK RENEWAL PROGRAM <br />12 <br />Fairview Ave (South of B2) <br />133 <br />On -road and off -road pathways between Roselawn <br />Done: 2011 - <br />Avenue and County Road B -2 <br />2012 <br />Fairview Ave (B2 to C) <br />On -road and off -road pathways between County <br />Road B2 and County Road C <br />Done: 2012 <br />21 <br />Rice St. (Co Rd B to Co Rd <br />B2 ) <br />Done: 2011 <br />19 <br />Dale St North of Co Rd C <br />73.75 <br />Off- street trail from S Owasso Blvd to County Road <br />C <br />Done: 2011 <br />22 <br />Brenner to Langton <br />61.5 <br />Pathway connection between Brenner Ave and <br />Connection <br />Langton Lake Park <br />Done: 2011 <br />