My WebLink
|
Help
|
About
|
Sign Out
Home
2013-04-23_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2013
>
2013-04-23_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 3:21:57 PM
Creation date
4/18/2013 3:17:41 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
4/23/2013
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: April 23, 2013 <br />Item Description: County Road 13-2/ Victoria Street Sidewalk Project <br />Item No: 7 <br />Background: <br />As a part of the Parks and Recreation Renewal Program, staff has developed preliminary layouts <br />for the proposed six -foot wide sidewalk along the following street segments: <br />• The north side of County Road B -2 from Lexington Avenue to Rice Street, <br />• The east side of Victoria Street from County Road B -2 to County Road B, and <br />• The west side of Victoria Street from County Road B -2 to the existing sidewalk at Prince <br />of Peace church. <br />The first public information meeting was held on February 28, 2013. The meeting was very well <br />attended with over 80 people in attendance. The feedback that was received at that meeting is <br />attached and we have also highlighted areas on the preliminary layouts that are attached. <br />Staff is working on project design. In the next several months, we will be conducting a number <br />of meetings with property owners to go over specific design details for the project. Most of these <br />meetings will be on site with individual property owners. Engineering's major focus is on <br />providing solutions for drainage, since that was the primary concern brought to us by property <br />owners at the meeting. Once we have developed plans that include solutions to the design <br />concerns that were brought up at the meeting, we will invite the neighborhood to another open <br />house. It is anticipated that will occur in May. <br />At this time staff is working towards a late summer construction project. <br />Recommended Action: <br />Discuss County Road 13-2/ Victoria Street Sidewalk Project preliminary layout and issues. <br />Attachments: <br />A. Preliminary layouts <br />B. Feedback Summary from February 28, 2013 meeting <br />
The URL can be used to link to this page
Your browser does not support the video tag.