Laserfiche WebLink
34 City Engineer Debra Bloom and Public Works Director Schwartz noted that <br />35 updates on various construction projects were included in tonight's meeting <br />36 packet and available on -line at the City's website at <br />37 www.cityofroseville.com /projects, and as detailed in the staff report dated March <br />38 26, 2013. <br />39 <br />40 Discussion included projected material costs this year compared with past years, <br />41 with staff remaining optimistic that asphalt prices may actually be less based on <br />42 lower oil costs than in 2012; status of the County Road D joint <br />43 Roseville /Shoreview Reconstruction Project, with the City Council approval at <br />44 their meeting last night, and anticipated schedule for a May 2, 2013 bid opening, <br />45 and proposed construction start after school ends on June 2 and hopefully <br />46 completed before school start in the fall, based on the critical water main <br />47 installation and south side sidewalk. <br />48 <br />Page 2 of 14 <br />