Laserfiche WebLink
4.0B <br />ACKGROUND <br />4.1The subject property, located in Planning District 11, has a Comprehensive Plan Land <br />Use Designation of Industrial (I) and a corresponding zoning classification of Industrial <br />(I) District. The proposal has been prompted by plans to develop an <br />FINALPLAT <br />approximately 185,000-square-foot, multi-tenant, office/warehouse facility. Although the <br />applicant and prospective developer have provided some details about the ultimate <br />development intended for the site, the reader should note that the details of the future <br />development are not germane to the consideration of the application; instead, <br />FINAL PLAT <br />any part of the development proposal which does not conform to the zoning code <br />requirements either would not be permitted or would be required to seek the appropriate <br />approval (e.g., variance or conditional use) as may be necessary. <br />4.2When exercising the so-called “quasi-judicial” authority when acting on a request, <br />PLAT <br />the role of the City is to determine the facts associated with a particular request and apply <br />those facts to the legal standards contained in the ordinance and relevant state law. In <br />general, if the facts indicate the applicant meets the relevant legal standard, then they are <br />likely entitled to the approval, although the City is able to add conditions to a plat <br />approval to ensure that the likely impacts to roads, storm sewers, and other public <br />infrastructure on and around the subject property are adequately addressed. <br />4.3At its meeting of November 1, 2012 Roseville’s Parks and Recreation Commission <br />reviewed the proposed against the park dedication requirements of <br />PRELIMINARY PLAT <br />§1103.07 of the City Code and recommended a dedication of cash in lieu of land. City <br />Code §314 (Fee Schedule) establishes the Park Dedication fee as being equal to 5% of <br />the estimated fair market value of unimproved land, as determined by the Ramsey County <br />Assessor’s office on the date of approval of the plat or subdivision. The estimated market <br />value of the subject property is $2,544,600, as determined by Ramsey County in 2013 in <br />preparation for tax year 2014; 5% of this amount is $127,230. While the park dedication <br />requirement is activated by the plat/subdivision process, the park dedication fees for <br />other Meritex plats in recent years have been collected at the time building permits were <br />issued for the development of the platted lots rather than at the time the plats were filed; <br />Planning Division staff therefore recommends collecting the required park dedication at <br />the time building permits are issued for the subsequent development. <br />4.4The proposed was approved as part of the City Council’s Consent <br />PRELIMINARY PLAT <br />Agenda on April 15, 2013 with the conditions that the applicant continue working with <br />the Public Works Department to address easements and water and sewer infrastructure <br />requirements as necessary, and that Meritex shall provide documentation demonstrating <br />ownership of Parcel 2 prior to consideration of the .Documentation of <br />FINAL PLAT <br />Meritex’s ownership of the property included in the proposed plat has been provided and <br />is on file in the Community Development Department. <br />5.0FPA <br />INALLATNALYSIS <br />5.1Plat proposals are reviewed primarily for the purpose of ensuring that all proposed lots <br />meet the minimum size requirements of the zoning code, that adequate streets and other <br />public infrastructure are in place or identified and constructed, and that storm water is <br />addressed to prevent problems either on nearby property or within the storm water <br />system. As a of an industrial property, the proposal leaves no zoning issues to <br />FINAL PLAT <br />PF13-004_RCA_051313.doc <br />Page 2 of 3 <br /> <br />