Laserfiche WebLink
Regular City Council Meeting <br /> Monday, May 13,2013 <br /> Page 21 <br /> unless they encountered limited space, but further advised that they didn't antici- <br /> pate that for the majority of the corridor. <br /> Mayor Roe clarified that, if there was no space for a flatbead truck on site and of- <br /> floading during normal working hours, there may be back-up alarms from fork- <br /> lifts or backhoes at some times, and potentially during other than normal work <br /> hours. <br /> Mr. Chelson concurred with Mayor Roe's clarification. <br /> Public Comment <br /> Neal Johnson,2098 Albemarle Court <br /> As the Vice President of the Homeowners Association at this location, represent- <br /> ing 32 units on that corner, Mr. Johnson advised that he was seeking additional in- <br /> formation from Xcel other than what was included in the letter from the City of <br /> Roseville, regarding the number of nights they would experience disruption. Mr. <br /> Johnson noted that this was the fourth year in a row with some type of construc- <br /> tion activity in this area: the Highway 36/Rice Street construction; Little Canada <br /> building of the Park and Ride facility; and now this project. Mr. Johnson noted <br /> that this prevented residents from opening their windows and limited their outside <br /> activities due to dust and noise. Mr. Johnson asked that future consideration be <br /> given in the planning process by the cities and other jurisdictions regarding these <br /> continual interruptions being experienced, and causing a number of people to <br /> move out of their complex. <br /> Regarding the type of noise, Mr. Johnson noted that today was a good example of <br /> an unending hum on the construction site; noting that this was very irritating and <br /> could interrupt sleep as much as a back-up alarm. <br /> With no one else appearing to speak, Mayor Roe closed the Public Hearing at ap- <br /> proximately 8:14 p.m.; and asked Xcel Energy representatives for their response. <br /> Mr. Chelson <br /> Regarding the continuous humming noise, Mr. Chelson advised that this was due <br /> to a tie-in procedure, but was not typically done outside normal working hours. <br /> Given the requested fifteen day period being requested, Mr. Chelson advised that <br /> Xcel owns that property, and there would be a significant amount of work, includ- <br /> ing pipe installation, at that location probably through the end of July, having <br /> been initiated over the last few days. <br /> As for planning, Mr. Chelson advised that, from Xcel Energy's perspective, this is <br /> the first of a four-year project, with work adjusted to working within the Ramsey <br /> County projected work schedule, requiring that Xcel meet that schedule and de- <br /> laying the project initially. Mr. Chelson advised that overall they would be laying <br /> down 11.5 miles of pipe, but only 2.5 miles of that was in the Roseville area, and <br />