My WebLink
|
Help
|
About
|
Sign Out
Home
2013-05-28_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2013
>
2013-05-28_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2013 4:28:20 PM
Creation date
5/23/2013 4:20:28 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/28/2013
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
347 <br />Ms. Bloom provided recommendations, reviewed drainage and other challenges <br />348 <br />of the project; addressed concerns of affected residents in relationship to what was <br />349 <br />in the way, what was being connected, the cost and how to make decisions for a <br />350 <br />good project; and how to fairly consider each of those elements. <br />351 <br />352 <br />Ms. Bloom provided staff's rationale for their recommendation of a pathway on <br />353 <br />the north side based on fewer trees and bushes to manage or remove, fewer <br />354 <br />driveways, power poles located on the south side, fewer fire hydrants, and the sun <br />355 <br />hitting the north side for melting quicker; as well as location of Central Park <br />356 <br />Elementary School on the north side. Ms. Bloom advised that staff continued to <br />Page 8 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.