My WebLink
|
Help
|
About
|
Sign Out
Home
2013-05-28_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2013
>
2013-05-28_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2013 4:28:20 PM
Creation date
5/23/2013 4:20:28 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/28/2013
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Upon request, the City Recycling Coordinator will undertake efforts <br />to educate the resident or owner regarding proper materials <br />preparation. <br />)ntractor shall maintain sufficient equipment and personnel to <br />sure that all collection operations commence no earlier than 7 a.m. <br />d are completed by 6:9".m. on the scheduled collection day. <br />can up any materials spilled or blown <br />i and /or hauling operations. Any <br />hind should be secured within <br />if provided. Driver shall take all <br />it littering of unacceptable recyclables. <br />>nsibility to remove any items that are <br />not recyclable materials and have been properly dealt with as <br />specified in 5.07. <br />5.11. Missed Collection Policy & Procedures <br />Contractor shall have a duty to pick up missed collections. <br />Contractor agrees to pick up all missed collections on the same day <br />that the Contractor receives notice of a missed collection, provided <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.